4855/AMRC/GM/2025 Kiln Modification for Hydrogen / Natural Gas Mix R2

Open

Buyers

Value

£300,000

Classifications

  • Natural gas
  • Hydrogen
  • Carbon
  • Miscellaneous equipment
  • Surface tempering machines
  • Heating-plant repair and maintenance work
  • Installation services of miscellaneous general-purpose machinery
  • Heating-system design services

Tags

  • tender

Submission Deadline

3 weeks from now

Published

1 day ago

Description

4855/AMRC/GM/2025         Kiln Modification for Hydrogen / Natural Gas Mix
The University of Sheffield wishes to invite tenders for a Kiln Modification for Hydrogen / Natural Gas Mix on behalf of the Advanced Manufacturing Research Centre, Castings Group at Catcliffe, South Yorkshire.
Scope of Requirement
The University of Sheffield Advanced Manufacturing Research Centre (AMRC) wishes to convert its existing kiln from natural gas to a natural gas and hydrogen blend. 
Sustainable Manufacturing is a core theme within the AMRC’s Technology Strategy and part of that theme is to decarbonise our own operations and to act as a demonstrator and experimental test bed for UK manufacturers looking to decarbonise their own operations. 
AMRC Castings are investing in pyrolysis equipment to supply our mould firing kiln with decarbonised natural gas (i.e. hydrogen / natural gas blend).  This is being tendered in parallel with this tender process.  
The furnace is a 656kW kiln used for firing the ceramic shells used for investment casting.  This will need modification/upgrading to be capable of operating with different blends of hydrogen and natural gas.
It is imperative that the conversion of our furnace includes interaction with the control system of the decarburisation equipment to comply with H&S requirements for emergency situations.   
Tender Process and Documentation:
This procurement is an EU open procedure conducted in accordance with the Procurement ACT 2023.
The ITT can be downloaded by registering and expressing your interest on the University`s e-tendering system https://in-tendhost.co.uk/Sheffield
If you have any questions or comments in relation to this tender they must be submitted via the In-tend System, this can be accessed at https://in-tendhost.co.uk/Sheffield
Closing date for the tender return is on November 11, 2025 at 12 noon (UK time).

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Site Steam Upgrade Project - Principal Contractor & Installation Package

The purpose of this project is to increase the Institute’s sustainability (both environmental & financial), reduce carbon emissions and safeguard the steam supply to all buildings utilising steam generated at Pirbright. This will be achieved by a combination of the following three factors: • New steam main & condensate recovery system to steam users currently served by the end of life Western Boiler House. • Removal of inefficient and end of life Western Boiler house & increasing load on the currently underutilised, efficient, EC1 steam generation plant by 450kWh (585 kg/hr). • Upgrading 2 of 4 EC1 steam boilers with burners capable of 10:1 turndown ratio to enable more efficient operation at low production rates during summer months. Contract Scope The contract is for a single supplier to act as the Principal Contractor and complete all works as follows: • Supporting the Stage 4 design with client nominated designer and Project Manager • Supply and Installation of EC1 steam boiler burners (x2). • Steam connection & packaged steam – LTHW interface to Engineering workshop • Enabling works for new steam & condensate return connections located on EC1 steam distribution and WBH. • Supply and installation of steam and condensate equipment. • Facilitate installation & commissioning of EC1 boiler burner replacements. • Supply and installation of new steam connection & condensate return including all required equipment. • Deliver a phased changeover of steam delivery from the WBH to the newly installed connection fed from EC1. • Decommission, removal and disposal of WBH and associated redundant equipment. • Disconnection and isolation of gas, compressed air and mains water. • Commissioning and handover including Project Information Folder (PIF) is provided to the client Project Manager.

Katy Reed

Published 5 hours ago
Open

Supply of Natural Gas for Apex Housing Association

Apex Housing are seeking to appoint a suitable Supplier of Natural Gas Scope of Services and Specification Summary: • The requirement has been divided into 2 regional lots based on supply areas. (Lot 1 – Phoenix network area & Lot 2 – Firmus network area). • Tenderers may bid for one or all lots and tenderers may be successful for one or all lots. • We wish to enter into a 12-month variable contract, anticipated to commence on 1st December 2025. • Only natural gas suppliers licensed by the Northern Ireland Utility Regulator are eligible to make submissions under this tender. • Information on gas consumption and the number of sites has been provided by the Association within the Tender package. However, information may be subject to minor changes and consumption may vary. • Additional sites may be added to any contracts during the contract term. • Prices should be all inclusive with the exception of VAT, which will be added at a rate of 5%. • Group billing must be provided along with an online billing facility / customer portal. • Payments from the Association are expected to be via Direct Debit with terms to be agreed. The contract will be procured in accordance with the Open Procedure as set out at Regulation 20(2(a)) of The Procurement Act 2023 (the Act or PA23). Nothing stated in this ITT or during the Competition is or shall be relied on as a promise or representation as to the future or a commitment by the Authority to award or enter into any contract. The Association reserves the right to not award to the lowest or any tender or to discontinue this Procurement Competition at any time. Apex have considered the use of Lots for this contract and have identified 2 suitable Lots.

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete