No.1 Market Street, Nelson, BB9 7LJ - roofing upgrade

Open

Buyers

Value

£225,000

Classifications

  • Roof repair and maintenance work
  • Roof repair
  • Roof maintenance work

Tags

  • tender

Submission Deadline

1 month from now

Published

21 hours ago

Description

No1 Market Street is a 3-storey modern office building constructed in 2007, situated in Nelson Town Centre.
Roof is a flat roof structure finished with single ply membrane, including false mansard and GRP dormers bounded in part by stone / blockwork parapet walling.
Scope of Works:
i.	Thermal upgrade and overlay of existing single ply membrane roof with SIKA Sikaplan G-18 Membrane - approx.1500m2 over 2 roof decks.
ii.	Ancillary works to parapet walling and abutment detailing.
Suppliers MUST be registered with SIKA Ltd Roofing Contractor Scheme.
https://gbr.sika.com/en/construction/roofing/roofing-support/contractor-schemes.html
Suppliers MUST be able to act as Principal Contractor under Construction (Design and Management) Regulations 2015 and BRAE Regulations 2023.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Pitched Roofing Refurbishment - 63-69 Tollgate Road, Andover

Procurement for works for main hipped roof refurbishment to flat block owned and maintained by Aster Group and Private Leaseholders with the following address - 63 to 69 Tollgate Road, Andover, SP10 3RF. The project is comprised of the following responsibilities: Pre-Works Identify vents/fans needing disconnection. Check for live gas or solid fuel appliances before chimney removal; get Aster Surveyor approval. Agree flue isolation, venting, and blocking up with residents and Aster Surveyor. Scaffolding Erect tubular steel scaffold with access for chimney removal. Measure to building face and include lift heights. TV & Satellite Relocate and reinstate 2 satellite dishes and 4 aerials. Test signals. Live aerials to be moved to loft post-removal. Chimney Removal Remove pots, flaunching, and chimney to below roof level. Cap and vent flues. Clear all waste. Structural Works Install new rafters, ridge timbers, and noggins to fill chimney void. Roof Strip & Insulation Remove tiles, battens, felt. Clear debris and install 50–75mm PIR insulation with ventilation gap. Roof Rebuild Fit breathable membrane, battens, and new tiles (Redland/Marley). Match colour to existing. Install dry ridge/hip tiles. Eaves & Guttering Fit eaves trays and rafter roll. Clean and retain existing gutters if serviceable; replace if not. Clean fascias/soffits if in good condition. Completion Test gutters for leaks and falls. Clean all windows, doors, fascias, and leave site tidy.

Katy Reed

Published 6 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete