DBC (AL) Leverstock Stock Green Village Shopping Parade Roof Replacement

Open

Buyers

Value

£200,000

Classifications

  • Erection and related works of roof frames and coverings
  • Roof repair and maintenance work
  • Roof repair
  • Roof maintenance work

Tags

  • tender

Submission Deadline

3 weeks from now

Published

5 days ago

Description

Leverstock Green Shopping Parade is a well-used local centre serving the surrounding residential community. The parade consists of several retail units and is an important hub for both residents and local businesses. 
The existing roof structure covering the shopping units has been assessed and found to be beyond economic repair. As such, a full roof replacement is required to ensure the ongoing integrity and safety of the premises. Above the retail units are residential flats, which are set back from the roofline, but the presence of residents should be taken into account when planning and delivering the works. 
The Council is seeking to appoint a competent and experienced roofing contractor to undertake the roof replacement to a high standard of quality and workmanship, while minimising disruption to both the shops, which will remain open during the works, and to the wider community. It is essential that access to the shops for deliveries is maintained wherever possible, and that appropriate measures are put in place to manage dust, noise, and site safety throughout the project.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Pitched Roofing Refurbishment - 63-69 Tollgate Road, Andover

Procurement for works for main hipped roof refurbishment to flat block owned and maintained by Aster Group and Private Leaseholders with the following address - 63 to 69 Tollgate Road, Andover, SP10 3RF. The project is comprised of the following responsibilities: Pre-Works Identify vents/fans needing disconnection. Check for live gas or solid fuel appliances before chimney removal; get Aster Surveyor approval. Agree flue isolation, venting, and blocking up with residents and Aster Surveyor. Scaffolding Erect tubular steel scaffold with access for chimney removal. Measure to building face and include lift heights. TV & Satellite Relocate and reinstate 2 satellite dishes and 4 aerials. Test signals. Live aerials to be moved to loft post-removal. Chimney Removal Remove pots, flaunching, and chimney to below roof level. Cap and vent flues. Clear all waste. Structural Works Install new rafters, ridge timbers, and noggins to fill chimney void. Roof Strip & Insulation Remove tiles, battens, felt. Clear debris and install 50–75mm PIR insulation with ventilation gap. Roof Rebuild Fit breathable membrane, battens, and new tiles (Redland/Marley). Match colour to existing. Install dry ridge/hip tiles. Eaves & Guttering Fit eaves trays and rafter roll. Clean and retain existing gutters if serviceable; replace if not. Clean fascias/soffits if in good condition. Completion Test gutters for leaks and falls. Clean all windows, doors, fascias, and leave site tidy.

Katy Reed

Published 6 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete