Replacement Lift within Ward Four (4) at Glangwili General Hospital (GGH)

Award

Description

Hywel Dda University Health Board (HDUHB) have a requirenment to replace the existing lift within ward four (4) at Glangwili General Hospital (GGH).
The works required are comprised of the dismantling and removal of the existing lift equipment, followed by the design, manufacture, supply, construction, installation, and commissioning of one (1) traction machine-room-less (MRL) stretcher passenger lift enhanced with bed passenger lift features.
The requirement shall be in place for one (1) year and five (5) months which includes a twelve (12) month warranty / maintenance period following the successful installation and handover of the new lift. Upon the conclusion of this maintenance period, the All-Wales lift maintenance provider will complete an inspection of the lift and absorb it into its contract portfolio.
Scope of the Contract
HDUHB are seeking to appoint a suitably qualified lift supplier to facilitate the replacement of the vertical transportation (VT) unit at GGH. The VT system must comprise of the following:
- A simplex, 20 persons / 1500kg Traction MRL Trolley / Stretcher Lift with a rated speed of 1.0m/s, spanning 4 levels which shall be designed, manufactured and installed in compliance with the requirements of Welsh Health Technical Memorandum (WHTM): Lifts (WHTM08-02: 2017) where existing design constraints allow.
- The existing lift is used to carry hospital beds. Its current dimensions are larger than the WHTM definition of a Trolley / Stretcher Lift. The New Lift will need to meet the existing dimensions and duty load as a minimum. For this reason, some features of the WHTM Bed lift specification will be necessary and incorporated into the design specification.
- The hospital site operates entirely on essential power. This means the supply power to the lift will be fed from a generator periodically. The supplier should allow for this in their design submission.
The Lift Contractor shall ensure that the design, manufacture, construction and installation of the lifts is undertaken in full compliance with the requirements of the Lifts Regulations 2016.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete