GB-Colchester: 0410 - Heathfield House Boiler Replacement

Award

Value

£72,500

Classifications

  • Boiler installations

Tags

  • award

Submission Deadline

11 months ago

Published

10 months ago

Description

Colchester Borough Homes (the Authority) on behalf of Colchester City Council (the Council) which is to commission a contractor to undertake Boiler Replacement works at Heathfield House, Abbotts Road, Colchester, CO2 8BJ.
      
      Site visits can be arranged via the messaging function within the Delta Portal and shall be strictly by prior appointment only during normal office hours.
      
      Full details of the requirements are detailed within the associated documents

Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
        
        The contract commencement dates are a guide and bidders are to confirm actual dates within their tender submission.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Site Steam Upgrade Project - Principal Contractor & Installation Package

The purpose of this project is to increase the Institute’s sustainability (both environmental & financial), reduce carbon emissions and safeguard the steam supply to all buildings utilising steam generated at Pirbright. This will be achieved by a combination of the following three factors: • New steam main & condensate recovery system to steam users currently served by the end of life Western Boiler House. • Removal of inefficient and end of life Western Boiler house & increasing load on the currently underutilised, efficient, EC1 steam generation plant by 450kWh (585 kg/hr). • Upgrading 2 of 4 EC1 steam boilers with burners capable of 10:1 turndown ratio to enable more efficient operation at low production rates during summer months. Contract Scope The contract is for a single supplier to act as the Principal Contractor and complete all works as follows: • Supporting the Stage 4 design with client nominated designer and Project Manager • Supply and Installation of EC1 steam boiler burners (x2). • Steam connection & packaged steam – LTHW interface to Engineering workshop • Enabling works for new steam & condensate return connections located on EC1 steam distribution and WBH. • Supply and installation of steam and condensate equipment. • Facilitate installation & commissioning of EC1 boiler burner replacements. • Supply and installation of new steam connection & condensate return including all required equipment. • Deliver a phased changeover of steam delivery from the WBH to the newly installed connection fed from EC1. • Decommission, removal and disposal of WBH and associated redundant equipment. • Disconnection and isolation of gas, compressed air and mains water. • Commissioning and handover including Project Information Folder (PIF) is provided to the client Project Manager.

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete