Clacton Leisure Centre Oil Boiler Replacement and Installation of New Solar PV's
Buyers
Value
£1,200,000
Classifications
- Solar energy
- Boiler installations
- Heat pumps
- Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
Tags
- tender
Submission Deadline
3 weeks from now
Published
4 days ago
Description
Project Objective The project aims to replace the existing end-of-life oil boiler system at Clacton Leisure Centre with a modern, low-carbon heating solution and and Installation of New Solar PV's. This is part of Tendring District Council's broader decarbonisation strategy and is supported by a successful PSDS Phase 4 grant application. Scope of Works Please review the specifications for the proposed works. Key Considerations The project is time-sensitive due to the failure of one of the existing boilers and the requirement to draw down most of Salix funding within the 2025/26 financial year. All works must be completed and commissioned by April/May 2026 to meet grant conditions. The project must be delivered with minimal disruption to leisure centre operations.
Similar Contracts
AI Bid Assistant
Our AI-powered tool to help you create winning bids is coming soon!
Timeline active
Evaluate
Award
Complete