CHIC KITCHENS AND BATHROOMS FRAMEWORK 2024-28

Award

Description

CHIC has supported members with previous new frameworks (for construction materials, works and services) and are now seeking to establish a 4-year framework for Kitchen and Bathroom renewals under our members Housing Capital and Investment Programmes.
 
The aim of the Kitchens and Bathrooms Refurbishments is to bring our member's homes with kitchens or bathrooms that are beyond their useful life respectively which is currently 25 and 30-year cycles respectively. 

The Authority recognises that our members have prioritised Compliance works, we are now in a downcycle of investment for key elements of disrepair. In order to rectify this, much more investment is required for key elements including Kitchens and Bathrooms. The kitchen upgrade may potentially use materials from the CHIC kitchens Supply Framework (2023).

Our members are responsible for a variety of property stock and may therefore be tenanted or other properties that are subject to Section 20 of Landlord and Tenant Act processes.

Our Kitchens and Bathrooms Framework will cover repair, maintenance and/or supply and installation of kitchens, bathrooms, wet rooms, wc and electrics. Works can include (but not limited to) the following;

•	Extraction of the existing kitchen/bathroom/wetroom / wc (including all existing fixtures, fittings, tiles, floor coverings)
•	Removal of any materials of asbestos content under controlled conditions and in accordance with all current legislation
•	Implement any structural alterations to allow for the installation of the new kitchen or bathroom
•	The removal from site of all debris and the disposal of in the correct manner
•	The supply and installation of new kitchens/bathrooms/wetrooms / wc (including all new units, sanitary ware, tiling, floor coverings, pipework amendments, electrical alterations, ventilation works, fixtures & fittings, decoration works)
•	Test and certify the works upon completion
•	Occupational Therapy requirements and to comply with Part M of the Building Regulations.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Kitchens & Bathrooms Programme

Trivallis are seeking to appoint experienced contractors to undertake the installation and renewal of kitchens and bathrooms, along with all associated works and delivery of wellbeing initiatives. The associated elements include, but shall not be limited to; I. Kitchen renewals II. Bathroom renewals III. Walk in showers IV. WC’s V. Rewiring Works under this contract will be carried out as a result of stock condition surveys which will identify the kitchens and bathrooms in Trivallis properties as having reached the end of their life cycle. The works will be carried out at properties owned by Trivallis, situated in the geographical area of Rhondda Cynon Taff and any future areas. This tender exercise aims to help Trivallis select a minimum of two (2) and a maximum of three (3) suitable partners to carry out the necessary works and services. Trivallis intends to award contracts to the top two (2) ranked bidders in the tender process and reserves the right to award each Lot to three (3) separate contractors pending evaluation of the tender bids. The contract will be split into 3 lots, the lotting structure can be found below; Lot 1 – Rhondda Area - Reference – PM170 Lot 2 – Cynon Area - Reference – PM171 Lot 3 – Taff Area - Reference – PM172 Note that Contractors are eligible to bid on all 3 lots, However, their success is limited to a maximum of two Lots. We particularly welcome responses from small and medium sized enterprises (SMEs).).

Trivallis

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete