NOE CPC Specialist Estates Engineering & Maintenance Services (Hard FM)

Award

Value

£0

Suppliers

Classifications

  • Heating equipment

Tags

  • award

Submission Deadline

1 year ago

Published

11 months ago

Description

The purpose of this procurement is to establish a framework for the provision of Specialist Estates Engineering & Maintenance Services (Hard FM).

The framework will provide a one stop shop for organisations to fulfil their Specialist Estates Engineering & Maintenance Service (Hard FM) requirements, with suppliers selected for their experience and ability to provide customers with a comprehensive range of services and works that combine quality, value and compliance.
The framework has been designed to facilitate current trends in FM and also to provide a flexible route for Estates and FM departments within contracting authorities to procure services.

The framework Lots have been configured to enable Service Providers to be able to bid for areas within their specialism, making it friendly for SME's.

Service Providers have the option of bidding for one or more Lots within the framework, with NOECPC appointing up to 12 Service Providers for each Lot.

Lot 1 - Airconditioning, Air Handling Units and Refrigeration
Lot 2 - Asbestos Removal
Lot 3 - Automatic Doors and Roller Shutters
Lot 4 - Electrical Works
Lot 5 - Fire Alarm, Emergency Lighting and Fire Fighting Equipment
Lot 6 - Fire Risk Assessments
Lot 7 - Fire Stopping, Compartmentation and Associated Works
Lot 8 - Heating and Plumbing Systems
Lot 9 - Lifts, Hoists and Escalators
Lot 10 - Lightning and Fall Protection Systems
Lot 11 - Medical Gas Systems
Lot 12 - Security Systems
Lot 13 - Standby Power Systems
Lot 14 - Water System Maintenance and Risk Management
Lot 15 - Renewable & Low Carbon Heating Systems
Lot 16 - Solar PV
Lot 17 - General Building, Improvements, Installations, Repairs & Maintenance
Lot 18 - High Secure (Forensic) FM Services
Lot 19 - Managed FM Service

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Decarbonisation – Boiler Replacement

The objective of the PME is to gain market insight for the procurement of a Principal Contractor to deliver the Boiler replacement – Decarbonisation upgrade project. There is a single Contracting Authority for the scheme in Royal Armouries. There are no external organisations involved within the procurement of this scheme. Information in relation to the Boilers is available within Appendix A. ROYAL ARMOURIES are looking to gather feedback on which technologies are available to develop the project to take from the start of RIBA 2 through to RIBA 7. Outcomes: Royal Armouries wish to embark on a decarbonisation project to replace the existing 3 Boilers, with a new more energy efficient technology. The project forms the first step in the development of the Royal Armouries sites to meet their Net Zero targets. The Hot Water Heating Boilers are currently aged, manufactured in 1995, installed at Royal Armouries, Leeds during the initial build of the site, the Boilers use natural gas to provide heating and hot water. This project will form part of a larger decarbonisation plan for the Royal Armouries estate, the improvements to infrastructure, reliability and energy savings will provide much needed improvements to the Museum. The energy savings both in cost and CO2 generation, will allow for further developments to continue to improve the Museum. This will ensure that the Museum continues to provide its historical and cultural impact whilst maintaining a site that Visitors will want to utilise for not only the educational history that the Museum provides but also allow for increasing specialist events and exhibitions such as Gladiators: Heroes of the Colosseum. This Project shall provide the first major project in the Royal Armouries decarbonisation strategy. The successful delivery of which shall provide a key case study for future Business cases and proposals to allow for further decarbonisation projects. The Project estimated Contract dates are the 01/10/2025 – 31/03/2026 following completion of the Tender period. The Contract expiry date shall not be extended. The opportunity is suitable for SME’s and VSCE’s to participate in Tendering and PME. Site visits, should they be required will be arranged following issue of the PME with resulting requests for attendance to the Royal Armouries. To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=968321867

Katy Reed

Published 2 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

North of England Commercial Procurement Collaborative (NOE CPC) (hosted by and acting through Leeds and York Partnership NHS Foundation Trust.)

[email protected]

Timeline complete

Publish
Bid
Evaluate
Award