Decarbonisation – Boiler Replacement

Open

Buyers

Value

£450,000

Classifications

  • District heating
  • Long-distance heating
  • Water heaters and heating for buildings; plumbing equipment
  • Heating equipment
  • Central-heating equipment
  • Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery
  • Heat pumps
  • District heating boiler
  • Water tanks
  • Central-heating radiators and boilers and parts
  • District-heating mains construction work
  • Heating works
  • Heating plant construction work
  • District-heating plant construction work
  • Heating-plant repair and maintenance work
  • Roof works and other special trade construction works
  • Special trade construction works other than roof works
  • Electrical installation work
  • Electrical wiring and fitting work
  • Electrical installation work of heating and other electrical building-equipment
  • Other electrical installation work
  • Insulation work
  • Heating, ventilation and air-conditioning installation work
  • Central-heating installation work
  • Boiler installation work
  • Repair and maintenance services of central heating
  • Commissioning of heating installations
  • Installation services of electrical and mechanical equipment
  • Architectural, construction, engineering and inspection services
  • Architectural and related services
  • Engineering services
  • Consultative engineering and construction services
  • Engineering design services
  • Miscellaneous engineering services
  • Mechanical and electrical engineering services
  • Integrated engineering services
  • Engineering-related scientific and technical services

Tags

  • tenderUpdate

Submission Deadline

1 month from now

Published

1 day ago

Description

The objective of the PME is to gain market insight for the procurement of a Principal Contractor to deliver the Boiler replacement – Decarbonisation upgrade project. 
There is a single Contracting Authority for the scheme in Royal Armouries. There are no external organisations involved within the procurement of this scheme. 
Information in relation to the Boilers is available within Appendix A. 
ROYAL ARMOURIES are looking to gather feedback on which technologies are available to develop the project to take from the start of RIBA 2 through to RIBA 7.  
Outcomes: Royal Armouries wish to embark on a decarbonisation project to replace the existing 3 Boilers, with a new more energy efficient technology. The project forms the first step in the development of the Royal Armouries sites to meet their Net Zero targets. 
The Hot Water Heating Boilers are currently aged, manufactured in 1995, installed at Royal Armouries, Leeds during the initial build of the site, the Boilers use natural gas to provide heating and hot water. 
This project will form part of a larger decarbonisation plan for the Royal Armouries estate, the improvements to infrastructure, reliability and energy savings will provide much needed improvements to the Museum. The energy savings both in cost and CO2 generation, will allow for further developments to continue to improve the Museum. This will ensure that the Museum continues to provide its historical and cultural impact whilst maintaining a site that Visitors will want to utilise for not only the educational history that the Museum provides but also allow for increasing specialist events and exhibitions such as Gladiators: Heroes of the Colosseum. 
This Project shall provide the first major project in the Royal Armouries decarbonisation strategy. The successful delivery of which shall provide a key case study for future Business cases and proposals to allow for further decarbonisation projects. 
The Project estimated Contract dates are the 01/10/2025 – 31/03/2026 following completion of the Tender period. The Contract expiry date shall not be extended. 
The opportunity is suitable for SME’s and VSCE’s to participate in Tendering and PME. 
Site visits, should they be required will be arranged following issue of the PME with resulting requests for attendance to the Royal Armouries.
To view this notice, please click here: 
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=968321867

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Beach Management Framework

The Environment Agency requires a Framework to deliver its routine and ad-hoc beach maintenance works across all coastal frontages in England that it is responsible for. This maintenance typically consists of moving/transporting large volumes of shingle from areas of accretion to areas of erosion and evenly re-distributing shingle along the sea to restore/maintain the required standard of protection. There is a requirement to import marine dredged or land-based shingle onto coastal frontages to replenish lost material and to conduct maintenance/repairs to coastal defences and structures. There is a requirement to import and place rock on coastal frontages, as well as to provide coastal incident response, recovery and readiness support in the event of extreme weather events. This maintenance is essential to minimise the risk of coastal flooding to residential properties and commercial businesses. Market Engagement was undertaken using PIN notices via the PCR 15 regulations in May and December 2024. The Framework will operate as a single National Lot with a maximum of two Delivery Partners being appointed onto the Framework. The Framework duration will be a six-year (72 month) initial period with a 2-year (24 month) extension option (total eight years). The total estimated value of the Framework will be between £469,000,000 to £1,227,166,000 (exclusive of VAT). The procurement documents are available for unrestricted and full direct access, free of charge, at https://defra-family.force.com/s/Welcome Any questions, requests to participate, or tender submissions must be submitted electronically via this portal.

Katy Reed

Published 7 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Procurement Department

[email protected]

1132201946

Timeline active

Publish
Bid
Evaluate
Award
Complete