NCC1260 - Holywell First School Electrical Installation Works

Award

Value

£60,000

Suppliers

Classifications

  • Construction structures and materials; auxiliary products to construction (except electric apparatus)

Tags

  • award

Submission Deadline

6 months ago

Published

5 months ago

Description

Undertake works to Holywell First School's electrical system, including the upgrading of the lighting system.\r
\r
The electrical services installation shall comprise the following systems and equipment as detailed in the specification and shown on the drawings:\r
•	Identification of any electrical \r
•	Removal of existing redundant electrical services\r
•	Distribution equipment \r
•	Sub main and final circuit wiring \r
•	General power\r
•	Electrical connections to mechanical services equipment \r
•	Earthing and bonding. \r
\r
For further information on this project, please visit www.ProContract.Due-North.com and search for reference DN714042

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Disrepair & Associated Works

Charnwood Borough Council ('CBC') owns and manages around 5,450 rented properties and 333 leasehold dwellings based in the town of Loughborough, Leicestershire, and its surrounding towns and rural villages. CBC intends to enter into a contract with one successful Contractor under a bespoke form of the JCT Measured Term Contract ('the Contract') for a period of 2 years with the potential to extend for one further period of 2 years to a maximum of 4 years total contract duration. The Disrepair Works programme (the 'Programme') comprises an on-demand repair and maintenance service to occupied properties in the Council's housing stock which are the subject of a housing disrepair claim initiated by the tenant. The Programme includes to repair these properties within prescribed timescales in order to allow the Council to comply with its repairing obligations, increase customer satisfaction, and to prevent successful disrepair claims leading to financial loss to the Council. The Programme is estimated to commence in January 2024 and will include but not be limited to inspections and surveys, damp and mould works, plastering, re-pointing, joinery repairs, roofing and roofline works including missing tiles, and repairs to chimney stacks, rainwater gullies and downpipes, replacement of double glazed units, partial replacement of kitchen units and worktops, flooring repairs, plumbing repairs, repairs to WCs and bathroom suites, repair to plasterwork and ceilings, rehanging and/or replacing internal and external doors, lock replacements, , installing smoke and carbon monoxide detectors extractor fans and loft insulation, electrical and central heating.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete