National Framework for Decarbonisation Solutions

Award

Value

£6,240,000,000

Classifications

  • Construction work
  • Installation services (except software)
  • Solar panels
  • Ventilation installation work
  • Heating works
  • Installation of doors and windows and related components
  • Central-heating installation work
  • District heating boiler
  • Central-heating boilers
  • Installation of door and window frames
  • Scaffolding work
  • Ventilation and air-conditioning installation work
  • Heating, ventilation and air-conditioning installation work
  • Solar installation
  • Cladding works
  • Sound insulation
  • Central-heating radiators
  • Boiler installation work
  • Heating-system design services
  • Installation of doors and windows
  • Electrical wiring work
  • Water boilers
  • Immersion thermostats
  • Heat pumps
  • Radiators and boilers
  • Plastering work
  • Installation of window frames
  • Boilers
  • Thermal insulation work
  • Roof insulation work
  • Sound insulation work
  • Electricity, heating, solar and nuclear energy
  • Electrical installation work of heating and other electrical building-equipment

Tags

  • award
  • contract

Published

1 year ago

Description

Added Value Portal t/a Pagabo, acting on behalf of Hull City Council, is looking to establish a framework of Contractors who are capable of providing Decarbonisation Solutions. The framework will cover all UK Public Sector Bodies (excluding the Health Sector and NHS Trusts). The opportunity will consist of four value banded lots that cover Contractor delivery for a four-year term. The procurement will involve a single stage process following a Public Contract Regulations 2015 Open Procedure. This Framework Agreement is being advertised and tendered, so it can be utilised by all public sector bodies in the UK (excluding the Health Sector and NHS Trusts, the full list of applicable public sector organisations is available in the Tender synopsis on Pagabo's In- Tend portal - https://in-tendhost.co.uk/pagabo/aspx/ProjectManage/1270. The framework shall have the facility for Client Organisations to Direct Award and Further Compete their requirement.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Southern Gateway - Main Contractor

BTQ LLP requires a Main Contractor for its Bristol Temple Meads Southern Gateway Car Park project. The Southern Gateway is a strategically significant infrastructure project forming a key component of the Bristol Temple Quarter (BTQ) regeneration programme-one of the largest city centre regeneration schemes in Europe. The Southern Gateway will deliver a new southern entrance to Bristol Temple Meads Station, enhancing connectivity, enabling sustainable transport modes, and unlocking development potential in the southern part of the BTQ area. The scheme is being delivered by BTQ LLP, a joint venture between Bristol City Council, Homes England, and the West of England Combined Authority. While Network Rail is not a formal member of the LLP, it is considered a critical delivery partner due to its role in station infrastructure and operational integration. The key elements of the proposed development comprise of the following: A 7 storey multi-storey car park (MSCP) at the centre of the site, providing both car parking and motorcycle parking; A 3 storey cycle pavilion at the north-west of site, providing a mixture of secure Sheffield stands and two-tier cycle parking; The creation of a high quality public realm between the MSCP and cycle pavilion, with dwell spaces and areas for temporary pop up uses. As well as hard and soft landscaping and drainage; An improved fully segregated full width pedestrian footway and two-way cycleway adjacent to Bath Road which is intended to connect into future active travel improvements along this section of the highway; A cycle route to the cycle pavilion from the improved cycleway adjacent to Bath Road; 1no. new bus stop with waiting facilities and layby adjacent to Bath Road; A signal-controlled vehicular access junction to the MSCP from Bath Road; and A Network Rail service yard and a relocated RRAP adjacent to the proposed Network Rail service yard.

Katy Reed

Published 4 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete