National Framework for Professional Services in Construction and Premises 2024 - AWARD

Award

Buyers

Value

£0

Suppliers

Classifications

  • Architectural, construction, engineering and inspection services

Tags

  • award

Submission Deadline

1 year ago

Published

1 year ago

Description

This Project has been awarded
      
      The next version of the framework will be structured to cover both multi-disciplinary solutions and single service solutions.
      The Framework Agreement is expected to be established for a period of 3 years, with the option to extend for a further period of up to 1 year, from April 2024. The Framework Agreement will be able to be utilised by all public-sector bodies (including Charities) in the UK (excluding Scotland), the full list is available in the Tender synopsis
      .
      The framework shall have the facility for Clients to Direct Award and Further Compete their requirement.
      
      To access the tender documents, you will first need to express an interest (if you haven't already done so), then you will need to click on the tab titled ITT.
      
      If you wish to bid for the Professional Services Scotland framework, then please locate National Framework for Professional Services in Construction and Premises 2024 - Scotland, express an interest and then click in the ITT tab.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Elmfield Road Multi-Disciplinary Consultancy Services

Bromley South, and specifically Elmfield Road, has been identified as a key employment site within the borough with opportunity for development and inward investment. This is supported by the Employment Land and Space Study, completed in 2024, and the Council's Growth Plan (2024-27). Elmfield Road is a 6.58-hectare site adjacent to Bromley South Station, predominantly occupied by office tenants, The Mall Shopping Centre, and an associated NCP car park. Elmfield Road offers a unique regeneration and investment proposition due to its commercial focus and its proximity to Bromley South Station and connectivity to London Victoria. Following the approval of the Council's Growth Plan and publication of the Employment Land and Space Study, an Elmfield Road Steering Group was established. This group brought together property owners, businesses, Network Rail, GLA, central government partners (DBT & Office for Investment), Your Bromley BID, and representatives from the Council's Planning, Highways and Estates Team. This group endorsed the development of a visioning and place proposition exercise for Elmfield Road and the surrounding area. To support this, the Council commissioned a multi-disciplinary team to produce high-level design concepts exploring the urban realm, connectivity, and wider opportunities. The resulting proposals were presented and reviewed at the Elmfield Road Steering Group in October 2024. While the high-level visioning exercise laid a strong foundation for shaping the Elmfield Road project, it was agreed that further work is needed to realise a comprehensive public realm improvement as part of the broader long term regeneration of Bromley South. To deliver this project, the Council is looking to appoint a multi-disciplinary design team, with Lead Consultant, to progress the design through to RIBA Stage 4, developing the scheme to detailed design as part of a package to be tendered for a works contract. Following the works contractor appointment, the Lead Consultant's role will transition to monitoring and advisory support, providing technical oversight, design compliance checks, and client-side assurance during the contractor's completion of the works (RIBA Stages 5 - 7). The Lead Conslultant will be required to assemble and managed a multi-disciplinary team to support the Council in delivering the Elmfield Road public realm improvements. The commission will cover RIBA Stages 1-7 Phase 1 - Pre-works (RIBA Stages 1 - 4): The Lead Consultant will act as design lead, developing the scheme from Preparation and Briefing through to Technical Design. This will include preparation of an Employer's Requirements (ER) package. Phase 2 - Following appointment of works contractor (RIBA Stages 5 - 7): Once the contractor has been appointed, the Lead Design Consultant's role will evolve to that of monitoring and advisory support, acting as client-side technical advisor. This will include contract administration, compliance monitoring, quality review, stakeholder liaison, and post-occupancy evaluation. To support this work, £160k in external funding has been secured through the UK Shared Prosperity Fund, as approved by Executive in March 2025. In addition, £909k from the existing Bromley Town Centre capital budget, sourced from S106 contributions, will be allocated to fund the works contract covering RIBA Stages 5-7. Please register and log-in to the portal to see the documents attached to this Invitation to Tender including full details of our requirements and instruction on how to submit a response.

Katy Reed

Published 5 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Shamayne Harris

[email protected]

1482975883

Timeline complete

Publish
Bid
Evaluate
Award
Complete