GB-Romford: YMCA Thames Gateway - 2026 Development

Open

Value

£100,000,000

Classifications

  • Building construction work

Tags

  • tender

Submission Deadline

4 weeks from now

Published

4 days ago

Description

Building construction work. Multi dwelling buildings construction work. Architectural, construction, engineering and inspection services. YMCA Thames Gateway is seeking a Pre Construction Services Agreement, enabling works, and a main design and build contract for the redevelopment of its Romford site. The scheme will deliver a six storey supported living centre to BREEAM Excellent standard, comprising approximately 3000 square metres of supported accommodation with 184 en suite units, resident amenity spaces, ancillary staff facilities, and cycle storage.

The development also includes flexible ground floor studios approximately 300 square metres, Use Class Sui Generis, publicly accessible open space, landscaping, sustainable drainage systems SuDS, a stormwater creek connecting to the River Rom and reconfigured access and parking. Sustainability measures will feature low carbon materials, solar panels, and air source heat pumps for heating, cooling, and hot water. This development will be part funded from by the Greater London Authority and will be subject to the terms of the funding agreement. YMCA Thames Gateway reserves the right to assign or novate contracts to a Special Purpose Vehicle SPV or related entity where required to support funding, delivery, or asset management arrangements.

Similar Contracts

Open

TENDER FOR UPGRADE WORKS AT AUGHAKILLYMAUDE, SHARE DISCOVERY VILLAGE, GARRISON AND ENNISKILLEN RANGERS FC REFERENCE: 2526 CP067I

Fermanagh and Omagh District Council invites Tenders from suitably qualified Contractors for upgrade and refurbishment works to four Co. Fermanagh based projects. 1 Aughakillymaude to include; • External railings to a listed structure with guidance from the Architect and NIEA • Storm proofing existing timber windows on a listed structure with guidance from the Architect and NIEA • The contractor will be responsible for project / contact management of the complete works and undertake the role of principal designer • Health and safety 2 Share Discovery village to include; • Floor upgrade to the main hall • Bleacher seating repairs to the main hall • Painting and decoration work • LED Light upgrades • Conference room upgrade work • Dining room upgrade work • The contractor will be responsible for project / contact management of the complete works and undertake the role of principal designer • Health and safety 3 Garrison Community to include 4 projects within the area; • Gillaroo Hall – Upgrade to the fire alarm and LED lighting provision • Melvin Recreation and Resource Complex – Upgrade and refurbishment of a room to enable fitout for a Sensory area. • Melvin Hall – External upgrade of paths and fencing • Cashel Community Hall – External painting and decoration • The contractor will be responsible for project / contact management of the complete works and undertake the role of principal designer • Health and safety 4 Enniskillen Rangers FC to include; • Upgrade of an existing timber portacabin to create a gymnasium area. • New external door and ramp • Electrical works • Soundproofing • Ventilation • The contractor will be responsible for project / contact management of the complete works and undertake the role of principal designer • Health and safety This is a funded project through the PEACEPLUS Local Action Plan Theme 1 – Local Community Regeneration and Transformation 1.1 ‘Enhancement to Existing Community Spaces/Halls’ Programme.

Katy Reed

Published 4 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Joe Moran

[email protected]

7842422665

Timeline active

Publish
Bid
Evaluate
Award
Complete