ITT - Fort Cumberland - Electrical Infrastructure upgrade (UID 150)

Open

Buyers

Value

£500,000

Classifications

  • Electrical installation work

Tags

  • tender

Submission Deadline

3 weeks from now

Published

3 hours ago

Description

The upgrade and replacement of the existing electrical infrastructure at Fort Cumberland, Portsmouth, which is a scheduled monument. The work is to include the upgrade of the main distribution board located in the site’s substation, various other distribution boards around the site and the trenching and replacement of the existing underground cabling that supplies each board, plus addition minor works of clipping existing cabling to structures and the removal of a small wind turbine system that is now obsolete.

Similar Contracts

Open

Electrical Installation Condition Report Testing (Domestic and non-domestic) for Wrexham County Borough Council

Wrexham County Borough Council is looking to appoint a single Contractor to undertake Electrical Installation Condition Reports (EICRs) and associated remedial works as and when instructed. The work may be located anywhere across Wrexham County Borough with all WCBC owned and / or managed buildings falling within the scope of this Contract. The Electrical Installation Condition Reports (EICRs) will be delivered as part of a structured five-year testing cycle to ensure a balanced and manageable programme. The works will be carried out in the following stages (assuming the contract is extended accordingly): - Year 1: up to 2,400 properties - Year 2: up to 2,400 properties - Year 3: up to 2,400 properties - Year 4: up to 2,400 properties - Year 5: up to 2,400 properties In Year 6, the programme will recommence with the retesting of the initial 2,400 properties inspected in Year 1, in line with the periodic inspection requirements. Following completion of EICR’s, WCBC may instruct the Contractor to carry out any remedial works that may arise. Whilst these figures are a guide, WCBC cannot commit to them and actual numbers may be higher or lower. No claim for loss of income, profit or similar can be made where figures do not match those contained within the full suite of tender documentation. Please note that WCBC may also instruct the successful Contractor to complete a EICR’s for properties it manages through it’s Local Lettings service but cannot guarantee this. Contracted Work will be let through the JCT Measured term Contract (MTC) 2016. It is anticipated that the Contract will commence on 2nd March 2026. The initial Contract will run for two (2) years. The Contract may be extended for two further periods of two years The total Contract Period including all allowable extensions is six (6) years. The Conditions of Contract which apply to the Contract prior to the extension period will apply to any extension of the Contract Period.

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete