CEFAS24-138 Contract for satellite data imagery for Blue Belt island nations

Award

Buyers

Value

£24,406

Classifications

  • Data collection and collation services

Tags

  • award

Submission Deadline

1 year ago

Published

3 weeks ago

Description

The Blue Belt programme is the UK Government's international marine conservation programme. It works closely with UK Overseas Territories to assist them in creating and maintaining healthy and productive marine ecosystems.

As part of this programme, the Cefas coastal processes team have been working on two projects in Anguilla and Diego Garcia, to help monitor erosion of the coastline. A large part of this work is helping to improve the understanding of the natural processes that are occurring on the islands through modelling and mapping the historic movement of the coastline. This is with an aim to create a database of historic and present coastal data, which can be used to determine an environmental baseline to advise coastal management decisions in the future.

Due to the remote location of these islands and small populations, background environmental data is sparse. Therefore, Cefas require satellite imagery of the islands over a range of dates for each island, in which the shoreline can be extracted to

Similar Contracts

Open

Monitoring of School Attendance

Monitoring of School Attendance of Children and Young People in Care and Children and Young People with an Education, Health & Care Plan (OOC). Wolverhampton City Council (the Council) has a statutory duty to monitor the school attendance of children and young people in care placed in out-of-city independent placements, and for children and young people with Education, Health and Care Plans (EHCPs) attending out-of-city education settings. This duty is primarily governed by the Education Act 1996 and relevant Department for Education (DfE) statutory guidance. To fulfil this responsibility, the Council requires a service provider capable of delivering a robust service for collecting and monitoring attendance data for these two cohorts. The overarching aim is to improve school attendance among Wolverhampton pupils placed outside the city by delivering an effective, responsive, and informative service. This will enable the Council to identify and address poor attendance early, ensuring timely intervention in cases of unauthorised absence. The provider will be expected to achieve the outcomes outlined in the performance indicators and the successful provider is expected to deliver as follows: * Implement a robust and efficient attendance monitoring service that ensures accurate and timely collection of attendance data for all education provisions. * The service should support multiple methods of data acquisition to maximise coverage and reliability. This may include: • Automated extraction of attendance data from education management systems, where integration with the school or setting's system is both feasible and secure, • Alternative communication methods, such as direct phone call with provisions or settings, to ensure attendance data is captured even where MIS integration is not possible.

Katy Reed

Published 2 weeks ago
Open

PRO004895 Flow and Asset Management Surveys including Wastewater Surveys

United Utilities is looking to re-procure its current framework for Flow and Asset Management Surveys. The framework will constitute 2 Lots: Lot 1 - Wastewater Network Asset Surveys Lot 2 - Flow & Water Quality Surveys Services required under the Lots are as follows: Lot 1: a) Manhole Surveys b) Pumping Station Surveys c) Combined Sewer Overflow ("CSO") Surveys d) Impermeability Surveys e) Drainage Connectivity Surveys Lot 2 services will be required in river, in sewer and in waste water treatment works (WwTW) as follows: a) installing sewer depth and flow monitors, b) river depth monitors, c) river stage boards, d) rain gauges, e) portable wastewater samplers, f) dissolved oxygen/temperature monitors, g) monitoring the equipment either continuously or for wet weather and dry weather events. h) all telemetry raw data, with the exception of rain gauges to be capable of being viewed live via a website and downloaded by the Procurer at all times. i) collection and processing of data in accordance with the requirements of the Call-Off Particulars of the required Survey, and j) production of reports in accordance with the requirements of the Call-Off Particulars of the required Survey. Surveys in a river may include Time of Travel Surveys and river flow gaugings together with continuous monitoring for the following: a) Time of travel surveys b) River flow gauging c) Continuous monitoring of: i) dissolved oxygen (mg/l) ii) dissolved oxygen (% Saturation) iii) temperature iv) phosphorus v) phosphate vi) pH monitoring vii) turbidity viii) chlorophyll ix) conductivity x) ammonium Surveys in WwTW will comprise a combination of flow and quality monitoring. Surveys may be for flow alone or for flow and quality monitoring combined. Surveys may be for sewer, river or treatment works in isolation or in combination The services required are to be provided in Cheshire, Merseyside, Manchester, Lancashire and Cumbria.

Katy Reed

Published 3 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete