Design and Build Contractor for PSDS3b Decarbonisation Works at Cornerstone Arts Centre, Didcot, Oxfordshire

Open

Buyers

Value

£1,592,000

Classifications

  • Building construction work

Tags

  • tender

Submission Deadline

3 weeks from now

Published

2 hours ago

Description

The Works for Option 1 will involve: 
Verification of RIBA 4 designs 
Removal of the gas-fired boilers and vessels and associated works in the internal plant room 
Installation of Air Source Heat Pumps (ASHP) and associated vessels and equipment to provide heating and Hot Water Services 
Removal and replacement of Air Handling Units and removal of the rooftop chiller 
Radiator replacements 
Installation of Solar PV 
All associated works and general building de-carbonisation measures 
Refer to the document pack for the full details. 
 The Works for Option 2 will involve: 
Verification of RIBA 4 designs for Solar PV only 
Installation of Solar PV and associated works 
Refer to the document pack for the full details. 
 If Option 1 is adopted, PSDS funding requires a 'whole building' approach to the decarbonisation measures identified for the M&E Services upgrade, including all reasonable steps to reduce heating demand and minimise the total building energy use.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete