UKRI-4689 - Mechanical Engineering Drafting Support

Open

Buyers

Value

£400,000

Classifications

  • Engineering design services

Tags

  • tender

Submission Deadline

1 month from now

Published

4 hours ago

Description

UKRI wishes to establish a Framework for the provision of Mechanical Engineering Drafting Support.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

SME Opportunity - Fibre & Copper Installation at Heathrow (Fujitsu)

Fujitsu is seeking a suitably qualified SME to undertake fibre and copper installation works as part of the Airfield/Airside Implementation programme at Heathrow. The appointed contractor will be responsible for the provision, installation, testing, and commissioning of fibre and copper infrastructure, delivered in accordance with relevant industry standards and Heathrow site-specific requirements. The successful SME will demonstrate capabilities across the following areas: • Installation of fibre optic and copper cabling infrastructure, including containment systems. • Termination, splicing, and testing of fibre and copper cables to required specifications. • Commissioning of installed infrastructure to support operational readiness. • Compliance with Heathrow safety, security, and airside access protocols. • Provision of installation documentation, test results, and handover packs. It will be necessary for the successful SME to have the following industry accreditations: • CSCS/ECS Certification for all site operatives. • NRSWA (New Roads and Street Works Act) accreditation where applicable. • Manufacturer certifications for fibre and copper systems (e.g., Excel, Commscope, Panduit). • ISO 9001 Quality Management certification. • ISO 45001 Occupational Health and Safety certification. • SMSTS - For Managers • SSSTS - For Supervisors • Asbestos awareness - All • Confined space and working at height - (as applicable) Target Supplier Profile • SME based in or near the Heathrow area. • Proven experience in fibre and copper installation within aviation, transport, or critical infrastructure sectors. • Ability to provide flexible, responsive support aligned with Heathrow's operational requirements.

Open

Site Steam Upgrade Project - Principal Contractor & Installation Package

The purpose of this project is to increase the Institute’s sustainability (both environmental & financial), reduce carbon emissions and safeguard the steam supply to all buildings utilising steam generated at Pirbright. This will be achieved by a combination of the following three factors: • New steam main & condensate recovery system to steam users currently served by the end of life Western Boiler House. • Removal of inefficient and end of life Western Boiler house & increasing load on the currently underutilised, efficient, EC1 steam generation plant by 450kWh (585 kg/hr). • Upgrading 2 of 4 EC1 steam boilers with burners capable of 10:1 turndown ratio to enable more efficient operation at low production rates during summer months. Contract Scope The contract is for a single supplier to act as the Principal Contractor and complete all works as follows: • Supporting the Stage 4 design with client nominated designer and Project Manager • Supply and Installation of EC1 steam boiler burners (x2). • Steam connection & packaged steam – LTHW interface to Engineering workshop • Enabling works for new steam & condensate return connections located on EC1 steam distribution and WBH. • Supply and installation of steam and condensate equipment. • Facilitate installation & commissioning of EC1 boiler burner replacements. • Supply and installation of new steam connection & condensate return including all required equipment. • Deliver a phased changeover of steam delivery from the WBH to the newly installed connection fed from EC1. • Decommission, removal and disposal of WBH and associated redundant equipment. • Disconnection and isolation of gas, compressed air and mains water. • Commissioning and handover including Project Information Folder (PIF) is provided to the client Project Manager.

Katy Reed

Published 6 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete