*Decarbonisation & Investment Works Framework [DN762948]

Award

Description

The Authority seeks to establish a multi-supplier Framework to provide Energy Efficiency Retrofit measures in accordance with PAS 2035, and traditional Investment and refurbishment works for domestic and public buildings for its Members and other Public Sector Contracting Bodies. 
The scope of the framework includes (but is not limited to)
PV and Battery Storage; ASHP / GSHP; Insulation including EWI, IWI, CWI, Loft and floor; Windows & Doors; Ventilation; Roofing; Roofline & rainwater goods; Electrical Work; Boiler Replacement; Hot water / heat distribution systems; Kitchens; Bathrooms; Damp & Mould remediation; Internal Decoration; Plastering; Carpentry & joinery; Wall tiling & Boarding; Above & Below DPC pipework; Footpaths; Associated works; Pre & Post Installation Surveys and Tests; PAS 2035 Consultancy
The tender is split into ten regional lots
•	Lot 1 - North East
•	Lot 2 - Yorkshire & Humber
•	Lot 3 - North West
•	Lot 4 - West Midlands
•	Lot 5 - East Midlands
•	Lot 6 - East of England
•	Lot 7 - South East
•	Lot 8 - South West
•	Lot 9 - London
•	Lot 10 - Wales
The authority seeks to appoint up to 10 suitably qualified Principal Contractors per Lot able to provide the full requirements.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

The Flexible Procurement and Supply of Half Hourly Electricity

FPA Consulting Limited (FPA) have been appointed By Associated British Ports Limited (the Authority) to provide advice and facilitate the procurement of Half Hourly Electricity on its behalf. FPA will not be a principal to any subsequent Contract and accepts no liability for the acts or omissions of the Authority with respect to the Contract. The Authority wishes to appoint a suitably qualified supplier or consortium on a single Lot basis to support it with the Flexible Procurement and Supply of Electricity across the Authority's estate. The Authority purchases approx. 135 GW of Half-Hourly (HH) electricity per annum across circa 115 settled meters via a flexible trading supply agreement. The current purchasing arrangement has been in place from June 2024 for supplies commencing 1st April 2026 to 31st March 2027. The Authority wishes to put in place new flexible HH electricity trading arrangement which will allow it to undertake HH electricity trading before the expiry of the current arrangements. The Contract will cover the supply period from 1st April 2027 to 31st March 2030, with the option to extend the contract terms for a further 3 years (3+3 arrangement). The Authority retains the flexibility to decide upon any extension term throughout the initial Contract term. Any extension period must be mutually agreed and will not be subject to automatic renewal. All supply contracts under this agreement will terminate at the end of the agreed term and the supplier will not automatically renew supply arrangements without express written agreement from the Authority. This does not prevent the supplier Bidder from applying out of contract supply rates at the end of any agreed supply contract term. The key aims of this procurement for the flexible Procurement and Supply of Electricity are to:- • Provide the ability for the Authority to trade volumes of electricity from the Contract award date, in readiness for the start of the supply Contract • Provide the ability for the Authority to 'sleeve in' pre-executed trades at the commencement of any resultant supply contract. • Allow the Authority to procure 100% zero-carbon energy, backed by Renewable Energy Guarantee of Origin certification and/or 100% independent third party certified/accredited zero-carbon energy, for 100% of energy consumed by the Authority during the term of the supply contract. Further information, including site details and consumption data are included within the ITN documentation.

Katy Reed

Published 4 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Rebecca Griggs

[email protected]

+44 1912805665

Timeline complete

Publish
Bid
Evaluate
Award
Complete