Replace 19.429km of 132kV pressurised oil filled cables with 132kV non-pressurised XLPE solid cables
Replace 19.429km of underground pilot wire with fibre optic cables
Supply and install all ducting for the 132kV non-pressurised XLPE solid cables and fibre optic cables
Complete all civils work (excavation, backfilling and reinstatement) associated with the installation
Complete a single lane width reinstatement the length of the cable route (section approx. 1.8km) on the East Lancs road (A580) following the cable installation (Section 58 requirement)
Scope of this work is for the cable civils only however we are optioning the cable installation costs.
Replace existing outdoor sealing end structures at Bootle, Fazakerley and Gillmoss grid substations
The existing modern non-pressurised XLPE solid cable sections along the two circuits including the outdoor sealing ends structures will be retained and reused.
Drain, cut and cap of redundant oil filled cables and drain all associated oil tanks

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Mhairi McGilp

[email protected]

+44 7471366261

Timeline complete

Publish
Bid
Evaluate
Award
Complete