AG0573 - Cyclical Routine Maintenance and Associated Repairs of Foul Water Infrastructure Including Effluent Disposal 2024-2027

Award

Value

£539,910

Classifications

  • Sewage services
  • Sewage plant equipment
  • Repair and maintenance services

Tags

  • award
  • contract

Published

1 week ago

Description

Aster Group has approximately 76 foul water infrastructure assets (Sewage Treatment Plants, septic tanks and pumping stations) serving homes not connected to mains drainage.   There is an ongoing requirement to undertake routine maintenance of the foul water assets to ensure correct operation and compliance with Environment Agency discharge consents along with the emptying of septic tanks to provide effluent disposal arrangements for properties served by the installations.  This procurement is for the successor arrangement to the current contract which comes to an end in early 2025.  The requirement is for the provision of scheduled maintenance, non-scheduled maintenance works (where instructed) and provision of a provision of 24-hour, 365-day out of hours and emergency call out service.  Full details of the requirements are set out in the Procurement Documents.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete