Materials Testing Framework for STEP - UKIFS

Open

Buyers

Value

£7,000,000

Classifications

  • Inductors
  • Research, testing and scientific technical simulator
  • Technical testing, analysis and consultancy services
  • Composition and purity testing and analysis services
  • Technical testing services
  • Technical inspection and testing services
  • Mechanical and electrical engineering services

Tags

  • planning

Submission Deadline

3 days from now

Published

1 month ago

Description

UKIFS STEP programme (Spherical Tokamak for Energy Production) seeks to establish a materials testing framework as follows:
1.Magnets materials testing – mechanical/ thermal, electrical, and REBCO tests under cryogenic conditions at a range of temperatures down to 20 K, for magnet materials (HTS tapes, metals, insulators (composites), solders), and mock-up samples of magnets and structures where applicable. 
2.Vacuum Vessel & In-Vessel Systems (VIVS) manufacturing testing – mechanical, thermophysical and bespoke materials testing required to build a reliable material property database for increasing confidence in the system design into four key technologies: breeder blankets, divertors, plasma facing components and shields.
Two previous Requests for Information for this requirements were published with the following notices:
https://www.find-tender.service.gov.uk/Notice/000564-2025 
https://www.find-tender.service.gov.uk/Notice/002310-2025
We are looking for suppliers who can provide a range of services (one of more tests) to join the framework that will be in operation over the next 6 years (2 years + 2 years + 2 years). Tender publication is planned for 24th June. 
As part of the tender, bidders will be invited to attend a webinar explaining framework format and framework management principles.
To view this notice, please click here: 
https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=954979795

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Decarbonisation – Boiler Replacement

The objective of the PME is to gain market insight for the procurement of a Principal Contractor to deliver the Boiler replacement – Decarbonisation upgrade project. There is a single Contracting Authority for the scheme in Royal Armouries. There are no external organisations involved within the procurement of this scheme. Information in relation to the Boilers is available within Appendix A. ROYAL ARMOURIES are looking to gather feedback on which technologies are available to develop the project to take from the start of RIBA 2 through to RIBA 7. Outcomes: Royal Armouries wish to embark on a decarbonisation project to replace the existing 3 Boilers, with a new more energy efficient technology. The project forms the first step in the development of the Royal Armouries sites to meet their Net Zero targets. The Hot Water Heating Boilers are currently aged, manufactured in 1995, installed at Royal Armouries, Leeds during the initial build of the site, the Boilers use natural gas to provide heating and hot water. This project will form part of a larger decarbonisation plan for the Royal Armouries estate, the improvements to infrastructure, reliability and energy savings will provide much needed improvements to the Museum. The energy savings both in cost and CO2 generation, will allow for further developments to continue to improve the Museum. This will ensure that the Museum continues to provide its historical and cultural impact whilst maintaining a site that Visitors will want to utilise for not only the educational history that the Museum provides but also allow for increasing specialist events and exhibitions such as Gladiators: Heroes of the Colosseum. This Project shall provide the first major project in the Royal Armouries decarbonisation strategy. The successful delivery of which shall provide a key case study for future Business cases and proposals to allow for further decarbonisation projects. The Project estimated Contract dates are the 01/10/2025 – 31/03/2026 following completion of the Tender period. The Contract expiry date shall not be extended. The opportunity is suitable for SME’s and VSCE’s to participate in Tendering and PME. Site visits, should they be required will be arranged following issue of the PME with resulting requests for attendance to the Royal Armouries. To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=968321867

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline planned

Publish
Bid
Evaluate
Award
Complete