Description

This section of the Scheme will cover the construction of the highway improvements on A666 Barbara Castle Way from Victoria Street to Eanam, A666 Larkhill from Barbara Castle Way to Brookhouse Lane, and Penny Street from Barbara Castle Way to Brown Street, Blackburn

And will encompass the following works

• Footway improvement and re-surfacing including replacement and realigning the kerbs
• Improvements to pedestrian crossing locations
• Carriageway improvement and re-surfacing including replacement and realigning the kerbs
• Relocation, resetting and replacement of Street furniture
• Relocation and replacement of Traffic Signage and markings
• Decommissioning of existing traffic signals and pedestrian facilities - done by BwD term maintenance contractor
• Traffic signal civils works, to allow BwD term maintenance contractor to install traffic signal equipment, test and commission the signalised junction
• Highway drainage adjustments
• Liaison with stakeholders and the public
• Localised traffic management
• Disposal of any materials removed as part of the works
• Traffic Management for BwD term maintenance contractor to install traffic signal equipment, test and commission the signalised junction

Similar Contracts

Open

Highways Framework

Blackpool Council are establishing a lotted - Highways surfacing and civil engineering works Framework. The procurement will be conducted as an open tender and will establish a framework for a 4-year period. Call off contracts may be entered into from the framework in the manner described within the tender documents. The framework will consist of two lots as follows: Lot 1 – Highways Surfacing - Surfacing includes re-surfacing and re-construction of the highway network using conventional surfacing materials consisting of flexible and rigid pavement treatments (hot, warm and cold mix asphalts/concrete) Lot 2 – Highways Civils - Civil Engineering Works includes construction of improvement works on or associated with the highway network The intention is to establish a framework of up to 4 Suppliers for lot 1 and up to 4 Suppliers for lot 2. The indicative range of call off contracts that may be entered into is typically expected to be in the range as set out below: • Lot 1 – Highways Surfacing - £100,000 - £5,000,000 • Lot 2 – Highways Civils - £100,000 - £1,500,000 In addition to Blackpool Council the framework is being made available to Lancashire County Council, Blackburn with Darwen Council, Lancashire Combined County Authority, Current members, associate members and future members of the Association of Greater Manchester Authorities. The published tender documents set out full details of the procurement process. All tender documents are available free of charge through Blackpool Council's e-tendering portal - https://procontract.due-north.com/

Katy Reed

Published 5 days ago
Open

P1228 - Highways and Infrastructure Works Framework Agreement

Birmingham City Council is seeking to appoint organisations for the provision of Highways and Infrastructure Works via the Highways and Infrastructure Works Framework Agreement. These works will range from minor highway improvements, for examples new white lining, through various pedestrian and cycling improvements, to large scale infrastructure projects. The framework agreement will cover all works required to deliver highway and infrastructure projects for the Council. • Lot 1: works with an estimated value of up to £200,000. • Lot 2: works with an estimated value of between £200,001 and £1,000,000. • Lot 3: works with an estimated value of between £1,000,001 and £10,000,000. • Lot 4: works with an estimated value greater than £10,000,000. • Lot 5: contestable and non-contestable utility work related to capital infrastructure projects with no upper limit. The maximum number of tenderers awarded to each lot is as follows: • Lot 1: up to 10 • Lot 2: up to 6 • Lot 3: up to 3 • Lot 4: up to 2 • Lot 5: up to 3 Other local Public Bodies based within the East Midlands and West Midlands are entitled to use the Framework Agreement, subject to approval by the Council. This is affected by the completion of an access agreement between the Council and these other local Public Bodies. The open framework scheme will remain in place for a maximum period of up to eight years, commencing on the date that the Contract is awarded pursuant to this procurement process. Further details in respect of how the open framework scheme will operate are set out within the Framework Opening Protocol, contained in the tender documents. NEC4 terms and conditions will be used for this framework. Suppliers will need to ensure they are on the Central Digital Platform. Of the £980m framework spend (excl VAT), £640m of this is for Birmingham City Council

Katy Reed

Published 6 days ago
Open

P1228 - Highways and Infrastructure Works Framework Agreement

Birmingham City Council is seeking to appoint organisations for the provision of Highways and Infrastructure Works via the Highways and Infrastructure Works Framework Agreement. These works will range from minor highway improvements, for examples new white lining, through various pedestrian and cycling improvements, to large scale infrastructure projects. The framework agreement will cover all works required to deliver highway and infrastructure projects for the Council. • Lot 1: works with an estimated value of up to £200,000. • Lot 2: works with an estimated value of between £200,001 and £1,000,000. • Lot 3: works with an estimated value of between £1,000,001 and £10,000,000. • Lot 4: works with an estimated value greater than £10,000,000. • Lot 5: contestable and non-contestable utility work related to capital infrastructure projects with no upper limit. The maximum number of tenderers awarded to each lot is as follows: • Lot 1: up to 10 • Lot 2: up to 6 • Lot 3: up to 3 • Lot 4: up to 2 • Lot 5: up to 3 Other local Public Bodies based within the East Midlands and West Midlands are entitled to use the Framework Agreement, subject to approval by the Council. This is affected by the completion of an access agreement between the Council and these other local Public Bodies. The open framework scheme will remain in place for a maximum period of up to eight years, commencing on the date that the Contract is awarded pursuant to this procurement process. Further details in respect of how the open framework scheme will operate are set out within the Framework Opening Protocol, contained in the tender documents. NEC4 terms and conditions will be used for this framework. Suppliers will need to ensure they are on the Central Digital Platform. Of the £980m framework spend (excl VAT), £640m of this is for Birmingham City Council

Katy Reed

Published 3 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete