P1228 - Highways and Infrastructure Works Framework Agreement

Open

Buyers

Value

£980,000,000

Classifications

  • Construction, foundation and surface works for highways, roads
  • Construction work for highways, roads
  • Road construction works
  • Main road construction works
  • Ring road construction work
  • Roundabout construction work
  • Crossroad construction work
  • Construction work for highways
  • Highway maintenance work
  • Footpath construction work
  • Cycle path construction work
  • Paving and asphalting works
  • Surface work for footpaths
  • Foundation work for highways, roads, streets and footpaths
  • Foundation work for highways
  • Installation of road lighting equipment
  • Installation of illuminated road signs
  • Public utilities

Tags

  • tenderUpdate

Submission Deadline

1 month from now

Published

2 hours ago

Description

Birmingham City Council is seeking to appoint organisations for the provision of Highways and Infrastructure Works via the Highways and Infrastructure Works Framework Agreement.  These works will range from minor highway improvements, for examples new white lining, through various pedestrian and cycling improvements, to large scale infrastructure projects.
The framework agreement will cover all works required to deliver highway and infrastructure projects for the Council. 
• Lot 1: works with an estimated value of up to £200,000.
• Lot 2: works with an estimated value of between £200,001 and £1,000,000.
• Lot 3: works with an estimated value of between £1,000,001 and £10,000,000.
• Lot 4: works with an estimated value greater than £10,000,000.
• Lot 5: contestable and non-contestable utility work related to capital infrastructure projects with no upper limit.
The maximum number of tenderers awarded to each lot is as follows:
•            Lot 1: up to 10
•            Lot 2: up to 6
•            Lot 3: up to 3
•            Lot 4: up to 2
•            Lot 5: up to 3
Other local Public Bodies based within the East Midlands and West Midlands are entitled to use the Framework Agreement, subject to approval by the Council. This is affected by the completion of an access agreement between the Council and these other local Public Bodies.
The open framework scheme will remain in place for a maximum period of up to eight years, commencing on the date that the Contract is awarded pursuant to this procurement process. Further details in respect of how the open framework scheme will operate are set out within the Framework Opening Protocol, contained in the tender documents.
NEC4 terms and conditions will be used for this framework.
Suppliers will need to ensure they are on the Central Digital Platform.
Of the £980m framework spend (excl VAT), £640m of this is for Birmingham City Council

Similar Contracts

Open

PRO004895 Flow and Asset Management Surveys including Wastewater Surveys

United Utilities is looking to re-procure its current framework for Flow and Asset Management Surveys. The framework will constitute 2 Lots: Lot 1 - Wastewater Network Asset Surveys Lot 2 - Flow & Water Quality Surveys Services required under the Lots are as follows: Lot 1: a) Manhole Surveys b) Pumping Station Surveys c) Combined Sewer Overflow ("CSO") Surveys d) Impermeability Surveys e) Drainage Connectivity Surveys Lot 2 services will be required in river, in sewer and in waste water treatment works (WwTW) as follows: a) installing sewer depth and flow monitors, b) river depth monitors, c) river stage boards, d) rain gauges, e) portable wastewater samplers, f) dissolved oxygen/temperature monitors, g) monitoring the equipment either continuously or for wet weather and dry weather events. h) all telemetry raw data, with the exception of rain gauges to be capable of being viewed live via a website and downloaded by the Procurer at all times. i) collection and processing of data in accordance with the requirements of the Call-Off Particulars of the required Survey, and j) production of reports in accordance with the requirements of the Call-Off Particulars of the required Survey. Surveys in a river may include Time of Travel Surveys and river flow gaugings together with continuous monitoring for the following: a) Time of travel surveys b) River flow gauging c) Continuous monitoring of: i) dissolved oxygen (mg/l) ii) dissolved oxygen (% Saturation) iii) temperature iv) phosphorus v) phosphate vi) pH monitoring vii) turbidity viii) chlorophyll ix) conductivity x) ammonium Surveys in WwTW will comprise a combination of flow and quality monitoring. Surveys may be for flow alone or for flow and quality monitoring combined. Surveys may be for sewer, river or treatment works in isolation or in combination The services required are to be provided in Cheshire, Merseyside, Manchester, Lancashire and Cumbria.

Katy Reed

Published 4 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Commercial and Procurement Services

[email protected]

Timeline active

Publish
Bid
Evaluate
Award
Complete