Burnwood Community School Kitchen Extension Project

Award

Value

£450,000

Classifications

  • Construction work

Tags

  • award

Submission Deadline

1 year ago

Published

7 months ago

Description

Stoke-on-Trent City Council has allocated some funding for a kitchen extension at Burnwood Community School. The current kitchen is approximately 92 sqm in size and accommodates 6 adults along with a variety of kitchen appliances. \r
An extension is required due to the large increase in the school's pupil population. In 2011 the kitchen provided around 150 meals however due to the vast increase in pupil numbers, the school is now providing upwards of 400 meals per day for pupils from Nursery to Year 6. The extension design is expected to comply with BB103.\r
The Council intends to utilise a 2-stage Design and Build contract for this project. As such, the Council is now looking to appoint a contractor to undertake a Pre-Construction Services Agreement (PCSA). The contractor will be required to undertake all design work required to complete RIBA stages up to and including RIBA stage 4, with an approval process at the end of each RIBA stage.\r
The contractor will need to provide services in a number of fields including architectural design, mechanical, electrical, structural and civil engineering, building surveying, quantity surveying, and project management. Cost management and quantity surveying services will be required to ensure that the design that is being developed can be delivered for the allocated budget. These services can be provided either in-house or through sub-contracted specialists. The successful contractor will have and be able to demonstrate expert knowledge and recent experience of working with educational buildings.\r
The consultant will need to attend an inception meeting on site, and meetings to present the work to date at the end of each RIBA stage, with progress meetings throughout the work period arranged as necessary. These may be able to take the form of virtual meetings if appropriate.\r
The City Council has allocated a total budget of £450,000 for the kitchen extension. This budget is to include all costs including the PCSA fee, any other fees, surveys or direct costs, construction and fit out.\r
The deadline for the completion of the kitchen extension is the end of August 2025, in order that the kitchen is operational for the start of the school year in September 2025. This allows 6 weeks for construction during the school summer holidays, which is the preferred construction period. If construction is anticipated to take longer than 6 weeks, consideration will need to be given to the impact on the school's operation and meal provision during the term-time period. The contractor will be required to provide a construction programme and logistics plan for the construction period as part of the PCSA process.\r
At the end of the PCSA period, the contractor will provide their Contractors Proposals and the contract sum for the construction.

Similar Contracts

Open

Plot 2A Stretford Mall Residential Development

Trafford Council is seeking to appoint a contractor to carry out works including the design, construction, completion and defects rectification of a new-build Build to Rent block (Plot 2a) comprising 249 residential units, together with approximately 200m² of ground floor commercial space, associated amenity areas and public realm, forming part of a multi-phase masterplan at Stretford Mall. The project will be delivered on behalf of the Bruntwood Trafford Council Residential Joint Venture. The project (Plot 2a) will utilise a PCSA followed by Main Contract route with the contractor working with Trafford Council and its advisors to complete the design and agree a contract sum during the PCSA. The route to market is two stage Competitive Flexible Procedure. The first stage will comprise of the Procurement Specific Questionnaire which is a scored stage and will determine bidders that move onto the formal stage of tender (second stage) The specification, together with the accompanying tender documents, outlines the scope of requirements for the scheme and invites qualitative and financial submissions from suitably experienced contractors with the capability to deliver developments of this nature. The above represents Plot 2A but the Council are looking for a contractor to complete plot 2B and Plot 1 in addition to Plot 2A. The award of future phases will be determined by the Council at a later stage in the programme. The breakdown is as follows: Plot 2A £60m (exc VAT) Plot 2B £45m (exc VAT) Plot 1 £70m (exc VAT) The Council in conjunction with its advisers has a comprehensive understanding of the requirements and the market. Therefore, pre-market engagement will not be undertaken for this procurement. A planned procurement notice has not been completed as the contracting authority does not wish to reduce the timescales of this tender.

Katy Reed

Published 11 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete