Project Manager and Quantity Surveyor services

Award

Value

£0

Classifications

  • Building construction work

Tags

  • award
  • contract

Published

2 weeks ago

Description

Professional Services (Quantity Surveyor & Project Manager)

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

WDC - Responsive repairs and Void maintenance

Warwick District Council is procuring a new contract for responsive repairs and void maintenance via a competitive flexible procedure. The contract is responsive repairs reported by customers, repairs to void properties, in addition to other work streams identified in the scope of the contract. The aim is Improving services for repairs, voids, HHSRS, Damp and Mould, and Compliance are all part of the action plan agreed with the Regulator and are reflected in the term brief It is, therefore, essential for WDC to: • Ensure it can meet the Regulator for Social Housing's Consumer Standards • Ensure contracts deliver a customer-focused, efficient, and effective service • Fully comply with all statutory and compliance requirements relating to Building Safety • Provide an effective service to address Legal Disrepair claims and Housing Health and Safety Rating System Hazards • Put in place effective services to deal with Awaab’s Law • Appoint suitable contractors with experience and expertise in social housing repairs and maintenance to provide an effective value-for-money service to WDC • Ensure its contracting arrangements are fit for the future and allow innovation to be optimised Key objectives for this contract are: • Mobilisation is achieved on time and to the specified requirements • Ensure WDC can meet the Regulator for Social Housing's Consumer Standards for repairing and maintaining its housing stock • Ensure that the new contract delivers customer-focused, efficient, and effective repairs, maintenance, and voids maintenance service • Customer Satisfaction is met to an agreed standard • Ensure this arrangement assists the Council to fully comply with all statutory and compliance requirements relating to Building Safety • Provides a dedicated, targeted, and effective service to address Legal Disrepair claims and Housing Health and Safety Rating System Hazards • Provides a highly effective service to deal with Damp and Mould cases in line with Awaab’s Law • Ensure the arrangement is fit for the future and allows innovation to be optimised • Ensuring the contracted specification is delivered to the required standards • Void repairs are not marginalised • All workstreams are delivered within the agreed timescales specified in the Term Brief • Ensure comprehensive documentation and record keeping and provide key evidence to demonstrate compliance to the regulator Contract value is approximately £110 million (including extensions and future workstreams). Contract length is 15 years (5+5+5).

Katy Reed

Published 1 day ago
Open

Penrith Police Station Refurbishment 2025

The Penrith Police Station is an existing 3 storey building (located in the centre of Penrith) and will remain occupied in 24 hours operation for the duration of the works. The work will be carried out in phases including stand-down time between the phases to allow for decanting and re-occupation of completed areas. Externally: Formation of the Contractor's compound. For further details refer to the Access and Site Limitations drawing K1026-0-05 and Section 4.2 Significant Risks identified during Design. Any site accommodation located adjacent to surrounding buildings is to be 60 min fire resistant. Internally: The work content involves the refurbishment of individual rooms located on each floor level of the 3-storey building. Refer to Phasing Drawing K1026-0-04A. The refurbishment will involve stripping out all redundant fixtures, fittings and worktops, stripping out wallpaper and preparing finishes, replacement flooring, redecoration, replacement ceilings and LED lighting. The works (particularly to the services and drainage) may require penetration through existing fire-resistant construction and/or cavity barriers. The Contractor is required to have verifiable procedures in place for the making good, introduction of proprietary fire collars/sleeves etc. to maintain the integrity of the fire-resistant construction and/or cavity barriers. In addition to the installation of these services and drainage, a verifiable inspection and certification procedure for the integrity of the fire-resistant construction is required for submission at the completion of the Works.

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete