Description

By the Summer of 2026, NMRN are to introduce two new attractions into Boathouse No.6, Portsmouth Historic Dockyard (PHD) to deepen and broaden the offer to its audiences.

The NMRN is seeking the provision of new lifts on a design and build contract basis. The lift design and build contractor will be procured early in the RIBA 4 stage to allow the lift contractor to work with the design team and secure manufacturing windows to align with the base build programme and the requirements of the building and any requirements from its historic status.

There is additional documentation which can be sent upon request by emailing [email protected] 

There is a strong preference for those interested in bidding to conduct a site visit and details of how to arrange one can be found within the ITT Documentation.

Similar Contracts

Open

Access for All Rail Programme - Tranche 5

TfGM is looking to establish a contract for the completion of option selection reports (PACE ES3/OSR), completion of outline design (ES4 Form A) and completion of detailed design (ES5 Form B) - "Stage One" and further, construction (ES6-8) - "Stage Two" of rail station enhancement projects. These stations will be funded under the Department for Transport's (DfT) and "City Region Sustainable Transport Settlements (CRSTS)". The project involves upto four Access for All solutions for stations within Greater Manchester: Broadbottom, Hall 'ith Wood, Hattersley and Moorside (called Tranche 5). The AfA Projects at Hall'ith Wood, Broadbottom, Moorside and Hattersley comprise of a combination of new lifts, footbridges and ramp improvements Hall 'ith Wood: • 2 new lifts up to and connections to the existing platforms • Upgraded power supply Broadbottom: • 2 no. lifts and new footbridge/staircases to platform • Upgraded power supply Moorside: • Single lift and link structure to the existing station building • Remodeling of the existing ticket office and possible repairs to a fire damaged section of the roof. • Upgraded power supply Hattersley: • 1 new lift to platform with new footbridge and stairs to platform level • Removal of existing footbridge and modification works to the station building • Development of a link bridge to the Godley Green Housing development in conjunction with Tameside Council (Developer funded) • Upgraded power supply

Katy Reed

Published 2 months ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Dave Hartley

[email protected]

02392891370 ext 2042

Timeline complete

Publish
Bid
Evaluate
Award
Complete