EEAST - Framework for Vehicle Windscreen Service (24-T24)

Open

Value

£5,000,000

Classifications

  • Repair, maintenance and associated services of vehicles and related equipment

Tags

  • tender

Submission Deadline

2 days from now

Published

1 month ago

Description

The Authority is having a major concern regarding windscreen repairs and replacement. The<br/>current turnaround times are 3 to 4 days meaning vehicles are off the road while waiting repair and<br/>calibration. The intention is to reduce turnaround times in order to retain operational vehicles on the<br/>road with less downtime. It is the Authority’s desire is to move as many non-operational vehicle<br/>Windscreen repair to its main windscreen suppliers where possible. However, the Authority’s<br/>recognises the need to have contracted parties to provide an alternative windscreen roadside,<br/>station or workshop repair and especially a more speedier replacement calibration solution, where<br/>there is no current capacity. Vehicles covered under the arrangement will be of varying designation,<br/>can be marked and unmarked, but need to be treated with the same priority. Note, at Appendix B2<br/>is a list of the EEAST 125 sites so the supplier may be called on to attend either an Ambulance<br/>station or the local workshop. Vehicle fleets will vary in size and composition over time and the<br/>Suppliers will need to be agile to accommodate new vehicle types.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

The provision of Mobile Plant Equipment Hire & Maintenance - Hornsey Street

The Contractor shall provide the following service to the Client for the duration of the service period: The contract term shall be for three (3) years with the option to extend for a further two (2) years. [1 x Volvo L90H] Loading Bucket Tip of lip bucket 4.5m capacity with trash guard RUBBER BLADE 48" - Medium 911M 1" Lock Washers - Medium Blade (qty: 13) PLOUGH BOLT 1 x 4 (qty:13) PLOUGH NUT 1 " (qty: 13) Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility. Roll Over Protective Structures (ROPS) & Falling Object Protective Structure (FOPS) sound insulated safety care cab with environmental controls. All Cabs to be fitted with Air Conditioning. Air Pre-Cleaner to deal with dusty environment. Reversing Camera Amber warning beacon, audible reversing warning and standard reversing lights, red seat belts. Guarantee that plant supplied will be able to run on solid TY cushion tyres and without detriment to the plant or operator. Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points. Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes. Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste. Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines Fire Suppression System Plant Tracking System Load weighing systems to be installed on loading bucket to weigh material being loaded into hoppers or vehicles/containers. Hydraulic isolator switch to ensure complete shut down of plant in an emergency. Additional brush attachment option included required. 1 x Volvo L70 H Loading Bucket Tip of lip bucket 4.5m capacity with trash guard RUBBER BLADE 48" - Medium 911M 1" Lock Washers - Medium Blade (qty: 13) PLOUGH BOLT 1 x 4 (qty:13) PLOUGH NUT 1 " (qty: 13) Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility. Roll Over Protective Structures (ROPS) & Falling Object Protective Structure (FOPS) sound insulated safety care cab with environmental controls. All Cabs to be fitted with Air Conditioning Air Pre-Cleaner to deal with dusty environment. Reversing Camera Amber warning beacon, audible reversing warning and standard reversing lights, red seat belts. Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes. Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste. Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines Guarantee that plant supplied will be able to run on solid TY cushion tyres and without detriment to the plant or operator. Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points. Fire Suppression System Plant Tracking System Load weighing systems to be installed on loading bucket to weigh material being loaded into hoppers or vehicles/containers. Hydraulic isolator switch to ensure complete shut down of plant in an emergency. 1 x JCB 3CX/JCB 4CX/JCB 5CX Amber warning beacon, audible reversing warning and standard reversing lights. Front mounted bucket - 1 piece 50mm wear edge Front solid tyres Fire Suppression System Plant Tracking System Windscreen Cage Protection to fully protect the operator from debris falling from the bucket whilst maintaining maximum all round visibility. Isolator or emergency stop switch to ensure complete shut down of plant in an emergency. Reduced emissions (compliant with all current and planned legislation regarding emission control) - Euro 6 engines Automated engine cut off that shall activate with warning if plant is left in idle mode duration for longer than 3 minutes. All Cabs to be fitted with Air Conditioning Air Pre-Cleaner to deal with dusty environment. Reversing Camera Additional guarding around hydraulic hoses to minimise risk and wear and tear when in contact with waste. All Cabs to be fitted with Air Conditioning. Rear Selector Grab Attachment required for sorting recyclable materials such as metal, wood, mattresses. The Collection Point/Affected Property/Treatment Site The Affected Property operates 7 x days a week. Operating hours are: Mon 07:00am-00:00 Tues-Sat 07:00am-23:30 Sunday 08:00am-17:00 Closed only Christmas Day & New Years Day Frequency of Collection/Service/Testing The Contractor shall provide a fully inclusive repairs and maintenance package within the base price to include collection charges and costs. The Contractor shall guarantee that in the event of plant and equipment failure not caused by the Operator or their agents or in excess of 24 hours, the Contractor shall undertake to supply an equivalent plant at their own cost. In the event that the Contractor is not able to supply a replacement within the agreed timeframe the Company may seek to replace with another hired plant. The contractor shall reimburse the Company the full cost of replacement and shall include any transportation costs incurred as a result of this. All plant and equipment shall hold a minimum of 12-month warranty. The Contractor is to ensure that in the event of any breakdowns (within the company's operating hours) a qualified engineer shall be sent out to site to rectify within 2 hours from notification, to investigate and or remedy the fault and or supply replacement plant. All parts failing due to general and expected wear and tear are to be replaced the Contractor at their cost. The Contractor will produce a list of parts and components which will fall within this category and are exempt within 1 month of the contract commencing. All servicing is to be carried out in accordance with manufacturer's guidance and to the manufacturer's minimum recommended specifications. Copies of all service records and annual inspections will be supplied to the company within 7 working days of all works being completed and retained by the Contractor for a period of 3 years from the expiry of agreement. Upon completion of any and all servicing, maintenance and or repair works the Contractors engineer must supply a signed handover document which states what work has been undertaken and that the plant is now safe, fit for use, fully serviceable and meets all Health & Safety requirements e.g. LOLER or PUWER certification has been issued. Costs for all part, labour and travel through wear and tear are to be included. Solid tyres are to be supplied to begin with as a one of and thereafter will be replaced/repaired by the Company.

Katy Reed

Published 1 day ago
Open

On-Street EV Rapid Chargers (UK3)

Westminster City Council is looking to deliver up to 30 (Thirty) DC EV Rapid Charge Points within the borough with the award of a concessionary contract. These sites will consist entirely of on-street locations and our plan is to procure a contract that will deliver at least twenty-five 50kW output chargers with the potential, if site conditions allow, for up to 5 higher powered 100-150kW units. The Council will undertake a programme where the Rapid Charger sites which have been enabled by the Council’s own highways service provider, including the dedicated charging bays and signs. A Request For Information (RFI) is available to complete for interested organisations. To take part in the market engagement exercise, interested organisations should complete the RFI document which is available on the councils e-procurement tool ("Jaggaer"), reference SQ_30079 - On Street EV Rapid Chargers (Request For Information), and the link to Jaggaer can be found here: https://wcc.ukp.app.jaggaer.com/esop/ogc-host/public/wcc/web/login.jst?VISITORID=4a0544d5-013a-4429-ae33-6f6aa52d8650&_ncp=1722428316887.988243-1. Please copy and paste onto your browser. Further information can be found on the councils website here: https://www.westminster.gov.uk/about-council/procurement/our-esourcing-and-contract-management-solution. This questionnaire will not form part of the formal procurement process. All responses are to be submitted via Jaggaer (online procurement portal ref: SQ_30079 - On Street EV Rapid Chargers (Request For Information) no later than Midday (12:00 hrs (GMT)) on Tuesday 18th March 2025. The deadline for submitting clarification questions will be 12:00hrs Thursday 13th March 2025. Our expectation is that a procurement will follow on conclusion of the market engagement exercise. It is to be noted that a UK2 - Preliminary Market Engagement Notice relating to the above has also been issued.

Katy Reed

Published 1 month ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete