West Kirkby Gateway - Demolition

Award

Value

£120,790

Classifications

  • Site preparation work

Tags

  • award

Submission Deadline

8 months ago

Published

6 months ago

Description

SCAPE framework - direct award

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

DPS for Works & Maintenance

NHS London Procurement Partnership (NHS LPP) are releasing the Dynamic Purchasing<br/>Page 5 to 8<br/>System (DPS) for Works and Maintenance (formerly known as Minor Works and Maintenance) , which is made up of a number of related<br/>categories to support the NHS and the wider public sector to meet their repairs, renewals,<br/>backlog maintenance requirements.<br/>The categories are going to be released in a number of waves, potential suppliers are asked<br/>to review the description for each category and ensure that they meet the criteria before<br/>completing the required documentation to apply for a place on the DPS.<br/>The DPS is free for suppliers to apply to and has no limited value of works. The DPS will<br/>remain open to new applications throughout the life of the DPS, so suppliers can apply at any<br/>stage.<br/>The categories are: air handling units, filters, ventilation and extraction, asbestos<br/>removal/treatment, boilers and associated plant (install and Maintain), brick and blockwork,<br/>building (General), Building (Hospital), building management systems and automatic<br/>control systems, cleaning and site clearance, cooling and refrigeration – chillers condensers<br/>and split A/Cs, demolition work, doors, drainage, electrical installation and<br/>maintenance/services, emergency lighting and power, fencing and gates, fire protection,<br/>flooring (general), glazing, joinery and partition, landscaping, lifts, escalators and<br/>conveyance systems, medical gas pipeline and equipment maintenance, painting and<br/>decorating (general), plastering, plumbing, portable appliance testing and fixed wire testing,<br/>road maintenance (minor works), roofing, scaffolding, security, access control, intruder and<br/>CCTV systems, UPS and generators, wall and floor tiling, water systems — servicing,<br/>legionella testing, thermostatic mixing valves, water hygiene and associated plant, windows<br/>(PVCU), Curtain Wall, Sustainable onsite generation, Refurbishment, Mechanical &<br/>Electrical, Car parks, Building Information Management, Heat Networks, Energy Assets.

Open

Playground Surfacing - Grange Park, Burley in Wharfedale, LS29 7BU

Playground Surfacing - Grange Park, Burley in Wharfedale, LS29 7BU Please provide a quote for the following 3 options: Option 1 - Band Repairs to Safety Surfacing: Various band repairs totalling 177lm x 150mm in Black/Green 50:50 fleck (approximately 10 pads) to cut back, remove and dispose of existing rubber. To include Heras fencing panels to close of x 2 access points. Option 2 - Wetpour Overlay (Black or Colour Fleck): To supply and install black wet pour 50mm to the following areas totalling 63m2: Double Swing Bay Basket Swing Bay To supply and install black wet pour 40mm to the following areas totalling 174m2: Junior MPU Solar Spinner Roundabout Seesaw Cone Climber Trampoline Toddler MPU Chase cut edge (177m) Include costs of all Heras fencing, waste disposal and welfare facilities. OR To supply and install black & colour fleck wet pour 50mm to the following areas totalling 63m2: Double Swing Bay Basket Swing Bay To supply and install black & colour fleck wet pour 40mm to the following areas totalling 174m2: Junior MPU Solar Spinner Roundabout Seesaw Cone Climber Trampoline Toddler MPU Chase cut edge (177m) Include costs of all Heras fencing, waste disposal and welfare facilities. Option 3 - New Wetpour: To dig out surface and dispose of old surface (237m2). Regulate the subbase for wet pour (237m2). Supply and install black wet pour 50mm to the following areas totalling 63m2: Double Swing Bay Basket Swing Bay To supply and install black wet pour 40mm to the following areas totalling 174m2: Junior MPU Solar Spinner Roundabout Seesaw Cone Climber Trampoline Toddler MPU Chase cut edge (177m) Include costs of all Heras fencing, waste disposal and welfare facilities. OR To supply and install black & colour fleck wet pour 50mm to the following areas totalling 63m2: Double Swing Bay Basket Swing Bay To supply and install black & colour fleck wet pour 40mm to the following areas totalling 174m2: Junior MPU Solar Spinner Roundabout Seesaw Cone Climber Trampoline Toddler MPU Chase cut edge (177m) Include costs of all Heras fencing, waste disposal and welfare facilities.

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Paul Crawford

[email protected]

01623 457451

Timeline complete

Publish
Bid
Evaluate
Award
Complete