Redbridge House Refurbishment (Call off from PCF) - AWARD

Complete

Value

£0

Classifications

  • Building construction work

Tags

  • awardUpdate

Submission Deadline

6 months ago

Published

3 months ago

Description

The council is inviting tenders from suppliers on the Primary Contractor Framework who expressed an interest in the  refurbishment works to Redbridge House.
      
      The contract will be let on JCT Intermediate Building Contract with Contractor Design Portion, 2024 Edition.
      
      The timetable is below. Although the council does not intend to make any changes to this timetable, should it be required suppliers will be notified as soon as possible via InTend clarifications.
      
      Issue of tender documentation                              Monday 16th September 2024
      Deadline for requests for clarification                 Tuesday 1st October 2024 @ 17:00
      Tender submission deadline                                   Friday 11th October 2024 @ 12:00
      Issue of tender evaluation results                         Monday 4th November 2024
      Contract Award                                                             Monday 4th November 2024
      Mobilisation Period                                                     Monday 4th November -Sunday 1st December 2024
      Commencement                                                           Monday 22nd December 2024
      Completion                                                                     Friday 22nd March 2025
      End of defects period                                                 Sunday 22nd March 2026
      
      The deadline for submissions is Friday 11th October at 12:00 (Noon).

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Headquarters Dog Section Refurbishment 2025

Cumbria Constabulary require a refurbishment scheme to upgrade their existing dog kennels and attached buildings at their Carleton Hall, Penrith, Headquarters site. The current unit was constructed circa 1960 and comprises office accommodation, storage rooms, kitchen, welfare and 15 no. dog kennels. There is a generous grassed area externally which is used to exercise the dogs. Within the exercise area is a timber, freestanding kennel on a concrete slab. The site is enclosed by a chain-link fence. Construction is typical of that era with concrete block external walls, suspended ceilings, solid internal walls and a concrete floor slab. The kennels have a profiled sheet roof covering believed to be asbestos with the office accommodation having a bitumen felt flat roof. Windows are timber framed. A condition survey has revealed extensive defects and issues with the building fabric. The current condition of the kennels has also raised concerns around dog welfare due to their dilapidated condition. Due to the above, an urgent refurbishment project is required to bring the kennels up to the welfare standards. A light touch refurbishment scheme to the offices will be included, but the works will predominately be around the construction of the new kennels. There is known Asbestos Containing Material within the building. An R&D survey has been carried out which is included for your reference. The Asbestos Management survey is also included. Any asbestos removal should be included as part of the works. Demolition of the existing 15 kennels to allow for the construction of 13 new kennels. The footprint of the building cannot be increased; therefore, the total number of kennels is to be reduced to increase the size of 5 kennels to accommodate the large breed dogs. A detached, double quarantine kennel is to be constructed to replace the freestanding timber kennel which currently sits on the concrete slab. Some remedial works may be required to the concrete slab. The kennels will be a basic construction comprising concrete block with composite, insulated roof panels. An internal hatch will separate the run from the sleeping area which can be closed off using a mechanical pulley operated both internally and externally. A new dog wash is to be constructed with access gained from a new corridor and door opening within the attached building. An ecology survey has identified roosting bats to the flat roof of the main building. Therefore, the flat roof is to receive ad-hoc bitumen repairs.

Katy Reed

Published 5 hours ago
Open

Headquarters Dog Section Refurbishment 2025

4.1 Cumbria Constabulary require a refurbishment scheme to upgrade their existing dog kennels and attached buildings at their Carleton Hall, Penrith, Headquarters site. The current unit was constructed circa 1960 and comprises office accommodation, storage rooms, kitchen, welfare and 15 no. dog kennels. There is a generous grassed area externally which is used to exercise the dogs. Within the exercise area is a timber, freestanding kennel on a concrete slab. The site is enclosed by a chain-link fence. Construction is typical of that era with concrete block external walls, suspended ceilings, solid internal walls and a concrete floor slab. The kennels have a profiled sheet roof covering believed to be asbestos with the office accommodation having a bitumen felt flat roof. Windows are timber framed. A condition survey has revealed extensive defects and issues with the building fabric. The current condition of the kennels has also raised concerns around dog welfare due to their dilapidated condition. Due to the above, an urgent refurbishment project is required to bring the kennels up to the welfare standards. A light touch refurbishment scheme to the offices will be included, but the works will predominately be around the construction of the new kennels. There is known Asbestos Containing Material within the building. An R&D survey has been carried out which is included for your reference. The Asbestos Management survey is also included. Any asbestos removal should be included as part of the works. Demolition of the existing 15 kennels to allow for the construction of 13 new kennels. The footprint of the building cannot be increased; therefore, the total number of kennels is to be reduced to increase the size of 5 kennels to accommodate the large breed dogs. A detached, double quarantine kennel is to be constructed to replace the freestanding timber kennel which currently sits on the concrete slab. Some remedial works may be required to the concrete slab. The kennels will be a basic construction comprising concrete block with composite, insulated roof panels. An internal hatch will separate the run from the sleeping area which can be closed off using a mechanical pulley operated both internally and externally. A new dog wash is to be constructed with access gained from a new corridor and door opening within the attached building. An ecology survey has identified roosting bats to the flat roof of the main building. Therefore, the flat roof is to receive ad-hoc bitumen repairs.

Katy Reed

Published 5 hours ago
Open

Headquarters Dog Section Refurbishment 2025

4.1 Cumbria Constabulary require a refurbishment scheme to upgrade their existing dog kennels and attached buildings at their Carleton Hall, Penrith, Headquarters site. The current unit was constructed circa 1960 and comprises office accommodation, storage rooms, kitchen, welfare and 15 no. dog kennels. There is a generous grassed area externally which is used to exercise the dogs. Within the exercise area is a timber, freestanding kennel on a concrete slab. The site is enclosed by a chain-link fence. Construction is typical of that era with concrete block external walls, suspended ceilings, solid internal walls and a concrete floor slab. The kennels have a profiled sheet roof covering believed to be asbestos with the office accommodation having a bitumen felt flat roof. Windows are timber framed. A condition survey has revealed extensive defects and issues with the building fabric. The current condition of the kennels has also raised concerns around dog welfare due to their dilapidated condition. Due to the above, an urgent refurbishment project is required to bring the kennels up to the welfare standards. A light touch refurbishment scheme to the offices will be included, but the works will predominately be around the construction of the new kennels. There is known Asbestos Containing Material within the building. An R&D survey has been carried out which is included for your reference. The Asbestos Management survey is also included. Any asbestos removal should be included as part of the works. Demolition of the existing 15 kennels to allow for the construction of 13 new kennels. The footprint of the building cannot be increased; therefore, the total number of kennels is to be reduced to increase the size of 5 kennels to accommodate the large breed dogs. A detached, double quarantine kennel is to be constructed to replace the freestanding timber kennel which currently sits on the concrete slab. Some remedial works may be required to the concrete slab. The kennels will be a basic construction comprising concrete block with composite, insulated roof panels. An internal hatch will separate the run from the sleeping area which can be closed off using a mechanical pulley operated both internally and externally. A new dog wash is to be constructed with access gained from a new corridor and door opening within the attached building. An ecology survey has identified roosting bats to the flat roof of the main building. Therefore, the flat roof is to receive ad-hoc bitumen repairs.

Katy Reed

Published 5 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Procurement Service

[email protected]

023 9268 8235

Timeline complete