Heating Systems, Servicing and Repairs

Award

Value

£1,900,000

Classifications

  • Central-heating radiators and boilers and parts

Tags

  • award

Submission Deadline

8 months ago

Published

7 months ago

Description

The council has a statutory duty to service and maintain all housing heating systems. The council maintains a number of district heating systems and communal boilers which heat flats, sheltered housing blocks and commercial properties. 

A Direct Award has been made via a call-off from a Framework with Eastern Procurement Limited (EPL). 

EPL is a not-for-profit organisation offering specialist compliant framework agreements, social landlords and other public sector bodies, predominantly in the Eastern region. The council are owner members of EPL and work closely with them to create bespoke procurement frameworks. The frameworks promote value for money for the council and include SMEs and local suppliers.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

5471 – Bedwas High School, Boiler Replacement

Caerphilly CBC are inviting contractors to submit a tender for the replacement of the main boilers serving blocks A+B at Bedwas High School, Newport Road, Bedwas, Caerphilly. The scope of the project is fully described in the ITT. In summary the scope is: The contractor shall cost all necessary resources including weekend and overtime working to allow the project to be completed within the specified contract period Carefully survey all services in the existing plant rooms and remove all redundant mechanical and electrical services including any brackets and containment and all redundant plant bases. The contractor shall form new openings in the outside wall to install new weather louvres at high and low level. The contractor shall adapt and make good the plant bases which are to be re-used. The contractor shall install and set to work all new plant and controls generally as shown on the tender drawing. All new and existing services within the boiler room are to insulated as specified. The contractor shall employ the boiler manufacturer’s commissioning engineers to commission the new boilers and certificate them. Employ specialist commissioning engineers to hydraulically balance all system and sub circuits, and demonstrate the correct operation of all systems to the satisfaction of the contract administrator. The timescale for the work is 6 weeks from commencement of the contract. Contractors shall note that the work may continue into the school term time when pupils will be on-site and must make all allowances for segregating and securing the works area. Contractors shall submit a detailed programme of works when submitting their costs for the project. The Contractors shall detail all key timings showing as a minimum, site setup, plant delivery, re-instatement works and commissioning and how this will be achieved in the 6-week period given. Full details are provided in the ITT on Proactis Plaza

Katy Reed

Published 18 hours ago
Open

Decarbonisation – Boiler Replacement

The objective of the PME is to gain market insight for the procurement of a Principal Contractor to deliver the Boiler replacement – Decarbonisation upgrade project. There is a single Contracting Authority for the scheme in Royal Armouries. There are no external organisations involved within the procurement of this scheme. Information in relation to the Boilers is available within Appendix A. ROYAL ARMOURIES are looking to gather feedback on which technologies are available to develop the project to take from the start of RIBA 2 through to RIBA 7. Outcomes: Royal Armouries wish to embark on a decarbonisation project to replace the existing 3 Boilers, with a new more energy efficient technology. The project forms the first step in the development of the Royal Armouries sites to meet their Net Zero targets. The Hot Water Heating Boilers are currently aged, manufactured in 1995, installed at Royal Armouries, Leeds during the initial build of the site, the Boilers use natural gas to provide heating and hot water. This project will form part of a larger decarbonisation plan for the Royal Armouries estate, the improvements to infrastructure, reliability and energy savings will provide much needed improvements to the Museum. The energy savings both in cost and CO2 generation, will allow for further developments to continue to improve the Museum. This will ensure that the Museum continues to provide its historical and cultural impact whilst maintaining a site that Visitors will want to utilise for not only the educational history that the Museum provides but also allow for increasing specialist events and exhibitions such as Gladiators: Heroes of the Colosseum. This Project shall provide the first major project in the Royal Armouries decarbonisation strategy. The successful delivery of which shall provide a key case study for future Business cases and proposals to allow for further decarbonisation projects. The Project estimated Contract dates are the 01/10/2025 – 31/03/2026 following completion of the Tender period. The Contract expiry date shall not be extended. The opportunity is suitable for SME’s and VSCE’s to participate in Tendering and PME. Site visits, should they be required will be arranged following issue of the PME with resulting requests for attendance to the Royal Armouries. To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=968321867

Katy Reed

Published 6 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award