P5426 Leisure Facilities Back Office Professional Services & Systems Agreement (PSA)

Complete

Value

£500,000

Classifications

  • Recreational, cultural and sporting services

Tags

  • tenderAmendment

Submission Deadline

2 years ago

Published

10 months ago

Description

High Peak Borough Council and Staffordshire Moorlands District Council (the Councils) wish to openly invite tenders for the selection of a main provider for the Councils' Leisure facilities operational 'back office professional support and systems' contract.

The Councils are currently in outsourced concession contracts for the delivery of Leisure facilities operations, both are due to expire end of March 2024. Work is underway to establish a wholly owned Local Authority Trading Company (LATCo.) to manage their Leisure centres and deliver active health and wellness services for both Council areas, to be operational for 01 April 2024.

The Councils will be the Contracting Authorities at the point of award, however interested participants must note that there will be a requirement to novate the contract arrangements to the subsidiary company when established and operational.

The future contract will be for multiple requirements across a range of professional service disciplines and systems, to support the operation of the new company, including but not limited to:

- ICT Support (Leisure Centre specific electronic point of sale system, Office functions, website, All systems [including App, CRM, Digital Asset Management System]), 

Payroll system, Finance, Customer Data, Communications

- Finance Systems (Customer Payments, Purchase to Pay / Invoice payments, Invoices raised, VAT, Financial Information)

- Payroll (Monthly salary and wages, PAYE, Pensions, National Insurance, Other [inc annual leave, sickness, training records])

- Human Resources (Produce contract of employment, Record for starters/leavers, Annual leave records, Sickness records)

- Direct Support, Accident Reporting, Legislative Updates, App KPI Management

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Callington Skate Park

Construction Plan 1. Scope of Works. The works will include: • Site preparation and demolition of existing fence. • Earthworks, grading and sub-base preparation. • Installation of drainage systems. • Construction of reinforced concrete skatepark elements (bowls, ramps, platforms, coping). • Installation of street-style features (rails, ledges, stairs). • Perimeter works including pathways and landscaping. • Site clean-up, quality checks, and handover. 2. Methodology 2.1 Mobilisation • Establish site compound, temporary fencing and signage. • Set out works in accordance with approved design drawings. • Conduct pre-start meetings with subcontractors and suppliers. 2.2 Site Preparation • Clear vegetation, debris and unsuitable materials. • Carry out excavation to design levels. • Import and compact subgrade fill where required. 2.3 Drainage & Utilities • Install sub-surface drainage to prevent water pooling. • Connect to existing stormwater infrastructure. • Install conduits for future lighting and services. 2.4 Concrete Works • Coping and edging hot dipped galvanised. Cut ends to be treated with corrosion resistant paint system • Formwork, steel reinforcement and shotcrete application for bowls and ramps. • Machine finishing followed by hand-trowelling for smooth riding surfaces. • Expansion joints, coping stones and steel edges installed. 2.5 Ancillary Works • Install prefabricated hot dipped galvanised rails, ledges and modular features. • Construct pathways, seating areas and viewing zones. • Landscape the surrounding area. 3. Health, Safety & Environmental Management • Works to be carried out in accordance with [local construction safety legislation]. • Dust suppression and noise control measures. • Daily toolbox talks and risk assessments. • Waste management and recycling plan. • Public safety maintained through secure site fencing and restricted access. • Working hours 0800 to 1700. • All operatives working on site should have relevant CSCS cards.

Katy Reed

Published 7 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete