Refurbishment of Heating System at Win Pine House

Award

Value

£979,562

Suppliers

Classifications

  • Central-heating installation work

Tags

  • award

Submission Deadline

7 months ago

Published

3 months ago

Description

Design and installation of the communal and domestic heat and hot water upgrade works to include metering to both Heating and hot water and all required heating and hot water controls. Upgrade works to the Boiler House and current hot water provision. Additionally for the upgrading of all communal lighting to LED/PIR (Passive Infrared Sensor) lighting, so that lighting would automatically be dimmed when areas are not in use and increase in brightness when movement is detected thus reducing energy costs.

Direct Award under Lot 6 (Communal Heating (All)) of Fusion21 Heating, Renewables, and Electrical Framework (FTS 2024/S 000-003257)

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete