Pre Construction H&S Consultant

Award

Value

£7,645,000

Suppliers

Classifications

  • Health and safety consultancy services

Tags

  • award

Submission Deadline

1 year ago

Published

9 months ago

Description

Pre-Construction Health & Safety Consultant services for workstreams CH1, CH2, CH3, BP1, FLD1, FLD2, HR1, HR2, HR3, AC1, AC2, AC3, AC4, AD1, AD2 all as described in the Invitation to Tender. To include Principal Designer role also.

Additional information: Tender Clarification Number 4

An issued has been identified with the Appendix H pricing schedule affecting the summary sheet of the collection page, so if the old version is filled in, the values still carry over to the page, but the last phase is not included in the totals. To deal with this an updated schedule has been included as an additional document above or alternatively a manual adjustment to the formula to correct can be made

Tender Clarification Number 3 - Updated ITT (section 2.4.1) and scope of services in link above to reflect the role / requirements included in the Building Safety Regulations 2023.

Tender Clarification Number 2

Q1. We have reviewed the documents and note that the notice is separated out into four individual projects each under £2.5M construction cost, and that the notice states it is suitable for SMEs. We further note that insurance levels are set at £10M for Professional Indemnity and Public Liability, and that you have set a question asking if we would be prepared to obtain cover to these levels if our bid is successful. Can you please advise if we would be excluded from the opportunity by answering 'No' to the uplift to our insurance levels? 

A1. The Works are not separated into four individual projects they are only set out like this in the pricing schedule to help us allocate for differing funding streams. The works are broken down into 15 workstreams and whilst the appointment will be for all workstreams they will be progressed and possibly contracted separately and will be signed off at each RIBA stage subject to funding availability, planning and listed building consent. The £10M requirement is a pre requisite for appointment so £10M cover is required.

Tender Clarification Number 1 following Tender query.

Q1. Could we please have the ITT document in Word format? 

A1. We are not providing any of the documents in alternative format.

The workstreams are subject to funding being secured along with planning permission and listed building consent being obtained. The works will be signed off to proceed at each RIBA works stage subject to these variables.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

UKRI-4763 NERC - Aircraft Operations Safety Case Development for British Antarctic Survey and FAAM Airborne Laboratory

UKRI is seeking to appoint a supplier to provide Aircraft Operations Safety Case Development for the British Antarctic Survey and FAAM Airborne Laboratory with defined timescales for clearly outlined deliverables. This procurement will result in appointing a supplier via a contract for external aviation safety expertise to: •to assist in authoring fully developed aircraft operations safety cases for UK Research and Innovation (UKRI) owned aircraft and all science equipment carried on board, and; •to develop safety case processes and supporting procedures to enable further subsequent development and review in-house. UKRI owned aircraft are as below. British Antarctic Survey (BAS) •one De-Havilland Canada (DCH) DASH 7; •four DHC Twin Otters (DHC 6-300); and •one future replacement aircraft De-Havilland Canada DASH 8. Facility for Airborne Atmospheric Measurements (FAAM): •one BAE 146-301. The aircraft operate in non-standard environments, such as low altitude (FAAM) and the Antarctic/Arctic (BAS) and scientific communities a means to conduct cutting edge climate research. The UKRI Framework Document sets out safety and governance responsibilities with regards to delivery of National Capabilities: FAAM Airborne Laboratory and British Antarctic Survey. To fulfil those responsibilities, the AAP was set up to oversee the management of aviation risk within these air operations. It was agreed that a safety case methodology would be followed, in line with best practice and a Goal Structure Notation (GSN) safety case method was elected. Evidence exists to support these safety cases, though gaps exist. To view this notice, please click here: https://ukri.delta-esourcing.com/delta/viewNotice.html?noticeId=936606866

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete