DEPARTMENT FOR BUSINESS AND TRADE: Office for Product Safety and Standards- Construction Product Combustibility Testing

Award

Value

£810,000

Classifications

  • Technical testing, analysis and consultancy services

Tags

  • award
  • contract

Published

1 year ago

Description

The Department for Business and Trade (DBT), Office for Product Safety and Standards (OPSS) is the appointed market surveillance authority, responsible for enforcing the Construction Product Regulations (CPR) within the UK.
OPSS will carry out assessments and testing to determine the current levels of
compliance in the construction products sector in the UK in line with Construction Product Regulation requirements.

Similar Contracts

Open

Asbestos Surveys, Testing and Services and Asbestos Abatement Works

This tender comprises two national lots, both in relation to Asbestos Services/Works, as detailed below: Lot 1: Asbestos Surveying and Testing Services: • Carrying out cyclical surveying and re-inspection programmes to fulfil compliance requirements • Carrying out ad-hoc sampling/survey requests and programmes for planned, void, and responsive works • Providing survey data and documents to ensure TGP asset management system is updated • Carrying out air monitoring services following asbestos abatement works • Leading on asbestos incidents and acting as first point of call to triage incidents Lot 2: Asbestos Abatement Works: • Carrying out licensed, notifiable non-licensed, and non-licensed asbestos abatement works for planned, void and responsive works • Providing completion packs to ensure TGP asset management system can be updated Each lot is for the provision of National Services/Works. Bidders must clearly indicate the contract lot(s) for which they are submitting a tender in the Tender Certificate. There are no restrictions on the number of lots a bidder may submit a tender for; however, a bidder will be awarded no more than one (1) lot. In the event that a single bidder achieves the highest overall evaluation score for both lots, Lot 2 shall take precedence. In such circumstances, the bidder will be awarded Lot 2, and Lot 1 will be awarded to the next highest-ranked tenderer for that lot. A separate contract will be awarded for each lot, and each lot shall be awarded to one bidder.

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete