Upgraded electrical switchgear and lighting provision

Award

Value

£300,000

Classifications

  • Electrical wiring and fitting work

Tags

  • award

Submission Deadline

1 year ago

Published

1 year ago

Description

The Royal Cornwall Museum is upgrading its electrical supply. Works required include new switchgear in a different part of the museum and transfer of circuits once new supply is provided by National Grid. The opportunity is being taken to replace the emergency lighting system and to upgrade gallery and back of house light fixtures to LED plus replacement of control gear.

Additional information: Tender addendum issued 18 Sept. Lighting drawings, asbestos reports, EICR reports, additional photographs added. Instructions for Tenderers, Specification and Proposed Schematic drawing updated.

Tender clarification 25 Sept. Lighting control provisional sum to be inserted.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Jenner Building CO2 Detection System Replacement

The contract is for a single supplier to provide Design and Build of a New CO2 Detection System in The Jenner Building as per the User Requirement Specification (URS) for The Pirbright Institute (Pirbright), Ash Road, Pirbright, Surrey, GU24 0NF. The scope of this contract is to replace the existing CO2 detection system so it remains available to operate, safe, reliable and will serve the building for a minimum of 15 years. The scope of works will involve: • Detailed design work for the new CO2 Detection system, as per the URS, including drawings showing the exact location and configuration. • Supply, manufacture, delivery, installation, commissioning and certification of new CO2 Detection System • Removal & disposal of existing CO2 detection system and submission of all waste certificates to The Pirbright Institute. • Management of all subcontractors employed by the supplier to complete these works. • On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and a separate section which provides details of the following: o Brief Description of the works being carried out. o Project Risk Assessment. o Key structural principals. o Hazardous materials used. o Information on the future removal of installed plant. o H&S information about equipment provided for cleaning or maintaining installed plant. o The nature, location and markings of significant services. o Information and as built drawings of buildings, plant and equipment. o Step by step activities to carry out the works. o Lesson Learnt, challenges met and how they were overcome.

Katy Reed

Published 3 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete