Ashby Canal Reed Bed Restoration and Bore Hole Pump Replacement

Complete

Value

£500,000

Classifications

  • Repair and maintenance services of pumps, valves, taps and metal containers

Tags

  • tender

Submission Deadline

1 year ago

Published

2 years ago

Description

Leicestershire County Council (LCC) operate a pump and reed bed to replenish the Ashby canal during dry weather conditions. Water is pumped from old mine workings to the reed bed where it is cleansed before entering the canal via a pipe. The reed bed is located in the Council owned Donisthorpe Woodland Park.

Water has been filtered using a reed bed comprised of gravel weirs, gabions, a lagoon, and reeds. Over time the reed bed has become blinded with ochre, vegetation build-up, and reed encroachment into the lagoon. The reed bed requires restoration. Furthermore, the existing bentomat liner is reaching the end of its life expectancy and so LCC would like to take the opportunity to replace it.

The bore hole pump requires replacement to meet the water input requirements of the reed bed. The headworks, stilling chamber containing the water level meter and the control equipment for the pump require, replacement / refurbishment or updating.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Plymouth CAST Provision of Statutory Testing, Servicing and Reactive Repair Services

The Client is seeking to appoint a single Principal Contractor to deliver the full scope of Service Level Agreements (SLAs) outlined in the specification, which includes: a. Statutory compliance maintenance and Planned Preventative Maintenance (PPM) across in-scope mechanical, electrical and specialist systems (see Detailed Technical Specification for SLA Provision and other appendices). b. Reactive maintenance in line with the response model in Response Times. c. Technical support and management of specialist subcontractors engaged under this Contract. d. 24/7 operations support for emergencies. e. While elements of the service may be subcontracted, the Contractor will remain the sole point of contact for the Client and will retain full responsibility for the coordination, management, and successful delivery of all aspects of the contract. The Contractor must: a. Ensure and provide proofs that all employees and subcontractors meet and maintain the required standards of competence, compliance, and performance. b. Maintain clear and consistent communication with the Client, regardless of subcontractor involvement. c. Be accountable for all service outcomes, including timeliness, quality, and statutory compliance. d. Provide a unified reporting structure and escalation process for all services delivered under the contract. e. This approach is intended to ensure streamlined communication, efficient contract management, and clear accountability throughout the duration of the agreement.

Katy Reed

Published 3 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete