LEGIONELLA & WATER MONITORING SERVICES

Award

Value

£99,544

Suppliers

Classifications

  • Water-treatment work

Tags

  • award

Submission Deadline

3 years ago

Published

3 years ago

Description

The Control of Legionella Bacteria in Water Systems to all West Midlands Fire Service sites.  

The purpose of the work to be undertaken is to ensure that Hot and Cold-Water Systems which include all plant/equipment and components associated with that system, e.g. all associated pipe work networks, pumps, storage cisterns, feed tanks, valves showers, heat exchangers, etc. are fully compliant with The HSE Approved Code of Practice and Guidance document L8 and HSG274 pt2, The Control of Legionella Bacteria in Water Systems.  

Similar Contracts

Open

Plowright and Brooksby CETP BETP Calibrations Service Contract

Introduction The Pirbright Institute (Pirbright) is a world-leading centre of excellence in research and surveillance of virus diseases of farm animals and viruses that spread from animals to humans, working to enhance capability to contain, control and eliminate these economically and clinically important viral diseases (such as foot-and-mouth diseases virus (FMDV)) through highly innovative fundamental and applied bioscience. The facility also plays a crucial role in predicting which viruses are circulating globally and assessing their potential impact. This capability is essential for preparing and responding to outbreaks, ensuring rapid diagnostics can be deployed in the UK. The Pirbright Institute is inviting tenders for Plowright and Brooksby CETP/BETP Calibrations Service Contract at The Pirbright Institute. Contract Scope The Pirbright Institute is seeking a qualified contractor to provide comprehensive calibration services for all critical instruments associated with three Effluent Treatment Plants (ETP) systems across its research facilities. This includes: • Scheduled calibration of all sensors and instruments, split between critical (6-monthly) and non-critical (12-monthly) frequencies. • Provision of calibrated, UKAS-traceable test equipment by the contractor. • Provision of calibration certificates, registers, and documentation for all instruments. • Compliance with biosecurity, quarantine, and barrier shower entry/exit procedures while working under escort in high-containment environments. • Attendance at site for planned visits totalling approximately 27 days per year (18 days for Plowright CETP and BETP, 9 days for Brooksby BETP). • Any additional days required to complete calibration will be billed separately under the contractor’s standard fee rates. • Replacement of faulty or non-calibratable equipment will be costed and sourced separately under independent Purchase Orders. Equipment Covered The following systems are included in this contract: • Plowright Building  - Continuous Effluent Treatment Plant (CETP)  - Batch Effluent Treatment Plant (BETP)  - Approx. 239 instruments across both systems. • Brooksby Building  - Batch Effluent Treatment Plant (BETP)  - Approx. 131 instruments. Total: 370 instruments across all systems. Service Frequency • Every 6 months:  - Calibration of all critical instruments essential for containment and process control (e.g., temperature probes, pressure transmitters, flow meters critical to biosecurity performance). • Every 12 months:  - Calibration of all non-critical instruments (e.g., ancillary monitoring devices, level sensors, general process indicators). This results in two calibration visits per year per building: • Visit 1: Calibration of all instruments. • Visit 2 (six months later): Calibration of critical instruments only. Points to note: • A reasonable number of spare parts are to be held ready for call outs. • All engineers should be directly employed. • Location of proposed engineers to be provided.

Katy Reed

Published 1 week ago
Open

Water Hygiene Maintenance Services

Summary of Contract Scope for Water Hygiene Services The contract shall contain a number of sites across London & Windsor. Applicants must be technically able to deliver against the contract scope as follows: a. Planned maintenance according to the water risk assessment written schemes across all sites. b. Reactive water hygiene remedials arising from water sampling results across all sites detailed above. c. Routine maintenance of plant equipment, including magnetic filters, Orca copper silver systems, water softeners, ENWA filtration units, and swimming pools. d. Improvement, corrections and adjustments to water systems, as recommended under the risk assessment. e. Additional plumbing works, as agreed. f. Additional water hygiene sampling and other services, as agreed. g. Receive, update, and close out work using the RHPS CAFM system. h. Performance of all maintenance services in accordance with regulatory requirements and recommendations (e.g. O&M manuals and manufacturer’s recommendations), as appropriate to each Royal Household Property. i.Maintain industry standards and best practice maintenance and operation throughout the Royal Household Estates. j.Undertake full safety checks on all relevant systems, plant and equipment to ensure full compliance with European and British Standards, Building and Fire Safety Regulations, other statutory and legislative minimum standards, the requirements of the RHPS, and any other relevant technical publications. k.Perform asset list validation and asset tagging of water system assets in the first 90 days of the contract via the RHPS CAFM system. This includes updating relevant schematics and drawings to reflect updates / changes. l.Record and publish findings in regular service reports, including identifying low-use outlets, vacant properties and out of bounds / construction areas that could pose increased risk to water hygiene. m.Maintain all systems appropriate to the operating parameters of the Royal Household Property and assets. n.Provide training tools and materials to RHPS personnel, including for flushing and other agreed activities. o.Endeavour to prolong system life and recommend to the RHPS any variations to system requirements, that would reflect improved value for money. The first report will be six (6) months post the commencement date of the contract. p.Identify to the RHPS team energy and water optimization and reduced utility consumption opportunities. The first report will be six (6) months post the commencement date of the contract. q.Identify potential system risks, and suggest innovative improvements or solutions. r.Propose improved control mechanisms and additional equipment to improve the systems. s.Identify opportunities to reduce energy consumption and carbon emissions. t.Maintain all work areas in a clean, tidy and safe condition free from oil, grease, dust, debris, foreign objects, inappropriate storage and rubbish which will include keeping all work areas in an orderly state. u.Regular reporting to the RHPS, where the contract will be reviewed against Key Performance Indicators (KPIs). To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=991517905

Katy Reed

Published 2 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete