GB-Birmingham: Fire Risk Assessments

Award

Value

£150,000

Classifications

  • Risk or hazard assessment for construction

Tags

  • award

Submission Deadline

2 years ago

Published

2 years ago

Description

The scope of the Contract is the provision of Fire Risk Assessments (FRAs) to Pioneer properties including:
      
      •Type 3 FRAs including common parts to mews properties, low rise properties and complex buildings, plus a minimum 10% sample of individual dwellings within all blocks
      •Ad-hoc fire safety consultancy and advice
      
      The key requirements of the Contract are as follows:
      
      •Maintaining statutory compliance
      •Ensuring the safety of Pioneer residents
      •Achieving value for money
      •Achieving high levels of contract performance
      •Delivering Social Value
      
      A single Contractor is required to deliver the entire scope of the Contract.
      
      It is envisaged that the Contract with the Successful Bidder shall last for an initial period of 3 years, with an option to extend at the Pioneer Group's sole discretion for up to 2 further years, giving a total potential period of 5 years. 
      
      The estimated Contract commencement date is September 2022.

Additional information: This tender is being administered on behalf of the Pioneer Group by Clarity Procurement Solutions Limited.
        
        The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Project and Asset Care Execution (PACE)

The Project and Asset Care Execution (PACE) Framework opportunity will deliver Core Team, Jobs, Tasks, Projects and Gated Projects in nuclear facilities within the Spent Fuel Management (SFM) and Special Nuclear Materials (SNM) areas, but with the potential to deliver across any onsite nuclear facility where needed.<br/><br/>The work involves maintaining existing asset condition and providing new asset capabilities when needed, which requires a level of Sellafield Ltd Integrated Partner engagement, subject matter expertise and assurance. Typically, the work will be in line with the following:<br/><br/>• Design, procurement, installation, modifications and commissioning of plant and equipment, and their dismantlement and removal;<br/>• Asset care and support activities; and<br/>• Integrated project controls and project management.<br/><br/>Sellafield are procuring two (2) Lot PACE Partners to provide the full suite of PACE capabilities and it will be carried out as a single procurement consisting of 2 Lots:<br/>• Lot 1 – PACE Partner (SFM)<br/>• Lot 2 - PACE Partner (SNM)<br/><br/>The frameworks will be for a period of nine (9) years, with the option to extend for a further six (6) to a maximum of 15 years.<br/><br/>The estimated value is within a range of £1.9bn to £3.6bn (inflated) across the 15 year duration, with £2.4bn being the mid-point based on the anticipated scope and volume.<br/><br/>Sellafield gives no guarantee as to the actual spend.

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete