Provision of Property Services Support Contractors

Award

Buyers

Value

£3,000,000

Classifications

  • Repair and maintenance services

Tags

  • award
  • contract

Published

2 years ago

Description

Lot 1 – Responsive Repairs, Voids and Out of Hours (East Region)
Lot 2 – Responsive Repairs, Voids and Out of Hours (West Region)
Lot 3 – Planned Electrical: Domestic, Commercial and Emergency Lighting (East Region)
Lot 4 – Planned Electrical: Domestic, Commercial and Emergency Lighting (West Region)

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Post inspection fire door remedials

See the Request for Quotation document provided, that contains detailed instructions. Summary: William Knibb Centre (inc Meeting Room Suite), Montagu Street, Kettering, NN16 8AE - Post inspection fire door repairs. • Make compliant repairs to fire doors as highlighted by the report that adhere to current national standards and regulations such as The Building Regulations and Regulatory Reform (Fire Safety Order (2005) for example. Additional information: Clarification Q&A: Q: The RFQ mentions the spreadsheet is embedded within the document, but it doesn't seem to be there. Can you please send this over? A: You can insert your costs into the tables (F & G) on the RFQ Word document, which are on pages 13 & 14 Q: 1. Where the descriptions states 'door not certified/leaf not certified/no certification seen' we are unable to conduct the actions under BM-Trada, you would have 1 of 2 options, 1- replace the whole doorset or 2- complete the actions but these will not be certifiable and will be classed as a betterment fix*. Can you confirm the options you wish to go ahead with? Alternatively, I can provide costs for both options. *Betterment Explained: In these instances where we cannot be certain of a specific achievable fire rating, we work to a standard to provide "Betterment". This basically referrers to "something is better than nothing" type scenario. The products we use however are all tested to provide 120 Minutes Fire Protection (Up to 4 hours in some instances). These products however are only as good as the construction they are fixed to. A: You can cost for both but you must ensure that you structure how the costs are presented to clearly identify the options being priced for or your quotation may not be competitive. Q: do you have any more info on the doors and faults? Do you have any images etc? A: A site survey is recommended and that can be booked in with the contacts provided on the RFQ Document

Open

New Critical Pager System

Hywel Dda University Health Board are seeking to appoint a supplier to implement a paging solution across its four main sites. The contract duration will be for an initial three (3) year period with an option to extend for a further two (2) years. The agreement must include the initial supply and installation of any infrastructure relating to the paging solution as well as full service, maintenance, support, and training for the duration of the contract. The solution must meet the following key objectives, • Easy to manage. • ‘Light touch’ so that the team do not have to use it every day for it to remain operational. • Allow for Disaster Recovery (DR) on a singular site, i.e., two different paging infrastructure controlling locations on the same site. A Primary and a Secondary independent of one another with the facility to remotely invoke a switchover to the secondary location and also to remotely switch back to the Primary location. • Allow for Business Contingency (BC), i.e., allow a remote switchboard full access to manage a paging solution on an alternative site. For example, PPH Switchboard being able to fully manage the BGH Switchboard and handle the MET calls for BGH if so required and vice versa. All 4 main sites should have full operational access to the other three sites within the Health Board, i.e., beside local operational use, BGH also has full operational control of GGH, PPH & WGH, GGH has full operational control of BGH, PPH & WGH, etc. • HDUHB staff must be able to fully implement DR & BC without the need of the supplier unless there is an unplanned issue preventing the activation of DR/BC. • HDUHB staff must have the facility to be able to produce Ad Hoc reports on defined Key Performance Indicators (KPIs), e.g., how many MET calls have been raised in the last month or over a specified period.

Katy Reed

Published 1 day ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Organisation

Sarah Carpenter

[email protected]

+44 2088216586

Timeline complete

Publish
Bid
Evaluate
Award
Complete