NHMF Frameworx Consultancy Framework Agreements 2022 - Compliance Consultancy Services Tranche 1

Award

Value

£42,000,000

Classifications

  • Technical inspection services
  • Gas appliance maintenance services
  • Gas distribution and related services
  • Technical services
  • Technical analysis or consultancy services
  • Systems and technical consultancy services
  • Auditing services
  • Electrical installation work
  • Repair and maintenance services of electrical building installations
  • Operation of electrical installations
  • Electrical services
  • Technical inspection and testing services
  • Surveillance and security systems and devices
  • Engineering design services for mechanical and electrical installations for buildings

Tags

  • award
  • contract

Published

2 years ago

Description

Gas Audit Services
Electrical Audit Services
Security and Access Compliance Consultancy
The Frameworks are national covering England, Wales, Scotland and Northern Ireland with the ability to operate in specific geographical regions.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Jenner Building CO2 Detection System Replacement

The contract is for a single supplier to provide Design and Build of a New CO2 Detection System in The Jenner Building as per the User Requirement Specification (URS) for The Pirbright Institute (Pirbright), Ash Road, Pirbright, Surrey, GU24 0NF. The scope of this contract is to replace the existing CO2 detection system so it remains available to operate, safe, reliable and will serve the building for a minimum of 15 years. The scope of works will involve: • Detailed design work for the new CO2 Detection system, as per the URS, including drawings showing the exact location and configuration. • Supply, manufacture, delivery, installation, commissioning and certification of new CO2 Detection System • Removal & disposal of existing CO2 detection system and submission of all waste certificates to The Pirbright Institute. • Management of all subcontractors employed by the supplier to complete these works. • On completion, an O&M is to be submitted which provides details of works from design to completion. The O&M should include all relevant items shown in the PIF and a separate section which provides details of the following: o Brief Description of the works being carried out. o Project Risk Assessment. o Key structural principals. o Hazardous materials used. o Information on the future removal of installed plant. o H&S information about equipment provided for cleaning or maintaining installed plant. o The nature, location and markings of significant services. o Information and as built drawings of buildings, plant and equipment. o Step by step activities to carry out the works. o Lesson Learnt, challenges met and how they were overcome.

Katy Reed

Published 4 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete