Framework Agreement for Fitness Equipment Supply, Installation and Business Development Partnership

Award

Value

£0

Suppliers

Classifications

  • Fitness equipments
  • Installation services of fitness equipment
  • Fitness weights
  • Audio-visual equipment
  • Audio-visual materials
  • Repair and maintenance work in connection with sports facilities
  • Floor laying and covering work
  • Wood flooring work
  • Solid flooring
  • Floor-tiling work

Tags

  • award
  • contract

Published

3 years ago

Description

The Company invites tender bids for the framework for the Provision of the Supply, Delivery and Installation of Fitness Equipment. The contract duration is for 3 years, commencing in March 2022 and ending in March 2025 with the option to extend the contract for a period of up to 12 months.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Yate Outdoor Sports Complex All Weather Pitch & Track Floodlights

Site Address - Yate Outdoor Sport Complex, Broad Lane, Yate, Bristol, BS37 7LB Supply and installation of the full lighting system including removal of all existing floodlights at the All Weather Pitch & Athletics Track, replacement with new. The system is required to meet England Hockey and England Athletics Specification. • Class I hockey - maintained average illumination level of 500 Lux • Class II athletics - maintained average illuminance of 200 lux All works associated with the mechanical and electrical installation to include; • Removal and disposal of Mast 4 (M4) on the All Weather Pitch • Replacement of M4 - To supply and installation of 15m HL250E base hinged mast complete with concrete foundation and foundation kits identified in a structural survey report. • Mast 20 (M20) requires an overlap pot adaptor. The current bracket must be removed, and the mounting plate cut and prepared in accordance with the specifications. • General repainting and corrosion protection measures to all masts. • 52no LED luminaires, new brackets and drivers. • Removal and disposal of the existing HID floodlights. • On completion a satisfactory electrical test and light check to confirm Lux Levels. • A minimum 5 year parts and labour warranty. • Risk Assessments & Method Statements to be included. All Weather Pitch Floodlights (M1 - M8) and Mast 4 replacement to be completed first and preferably by the 1st September 2025. If works are carried out during September, then the engineers are to phase floodlight works so that only one floodlight column at a time shall be out of commission to ensure the sporting complex is still able to use the remaining floodlights for training. Athletics Track Floodlights (M9 - M20) to be completed by 30th September with engineers to phase floodlight works so that only one floodlight column at a time shall be out of commission to ensure the sporting complex is still able to use the remaining floodlights for training. The successful tender will be required to enter a JCT Design and Build form of contract with the client: Yate Town Council. Retention percentage 5% reducing to 2.5% on practical completion Valuations will be monthly. Should the works be completed in less than a month, payment will be made on receipt of invoice. 30 day payment terms.

Katy Reed

Published 3 weeks ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline cancelled

Publish
Bid
Evaluate
Award
Complete