Completion Contract For Construction of Sunnyside Wellness Village Bridgend

Unknown

Value

£0

Classifications

  • Building construction work

Tags

  • tenderUpdate

Published

3 years ago

Description

The Contracting Authority, as defined in accordance with the Public Contract Regulations 2015 as amended, for this contract opportunity is Tarbed Limited (‘Tarbed’). Accordingly, Tendering Organisation successful in the procurement process will enter into a contract with Tarbed.
Linc-Cymru Housing Association Limited (‘Linc’) are conducting the procurement process on behalf of Tarbed. Tarbed is a 100% owned subsidiary of Linc. Tarbed is a limited company registered under the Companies Act 2006 and undertakes development activity solely on behalf of Linc.
Tarbed is seeking a suitably skilled and experienced contractor to undertake the completion contract for the Sunnyside Wellness Village. Sunnyside Wellness Village includes fifty-nine (59) residential units and a Health Centre. The contract involves provision of a fully completed development including construction of the new buildings together with site preparation works, external works including extensive landscaping and drainage as well as required highways works.
Tarbed is working with Cwm Taf Morgannwg University Health Board as a Third Party Employer involved in the project.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Penrith Police Station Refurbishment 2025

The Penrith Police Station is an existing 3 storey building (located in the centre of Penrith) and will remain occupied in 24 hours operation for the duration of the works. The work will be carried out in phases including stand-down time between the phases to allow for decanting and re-occupation of completed areas. Externally: Formation of the Contractor's compound. For further details refer to the Access and Site Limitations drawing K1026-0-05 and Section 4.2 Significant Risks identified during Design. Any site accommodation located adjacent to surrounding buildings is to be 60 min fire resistant. Internally: The work content involves the refurbishment of individual rooms located on each floor level of the 3-storey building. Refer to Phasing Drawing K1026-0-04A. The refurbishment will involve stripping out all redundant fixtures, fittings and worktops, stripping out wallpaper and preparing finishes, replacement flooring, redecoration, replacement ceilings and LED lighting. The works (particularly to the services and drainage) may require penetration through existing fire-resistant construction and/or cavity barriers. The Contractor is required to have verifiable procedures in place for the making good, introduction of proprietary fire collars/sleeves etc. to maintain the integrity of the fire-resistant construction and/or cavity barriers. In addition to the installation of these services and drainage, a verifiable inspection and certification procedure for the integrity of the fire-resistant construction is required for submission at the completion of the Works.

Katy Reed

Published 4 days ago
Open

Penrith Police Station Refurbishment 2025

The Penrith Police Station is an existing 3 storey building (located in the centre of Penrith) and will remain occupied in 24 hours operation for the duration of the works. The work will be carried out in phases including stand-down time between the phases to allow for decanting and re-occupation of completed areas. Externally: Formation of the Contractor’s compound. For further details refer to the Access and Site Limitations drawing K1026-0-05 and Section 4.2 Significant Risks identified during Design. Any site accommodation located adjacent to surrounding buildings is to be 60 min fire resistant. Internally: The work content involves the refurbishment of individual rooms located on each floor level of the 3-storey building. Refer to Phasing Drawing K1026-0-04A. The refurbishment will involve stripping out all redundant fixtures, fittings and worktops, stripping out wallpaper and preparing finishes, replacement flooring, redecoration, replacement ceilings and LED lighting. The works (particularly to the services and drainage) may require penetration through existing fire-resistant construction and/or cavity barriers. The Contractor is required to have verifiable procedures in place for the making good, introduction of proprietary fire collars/sleeves etc. to maintain the integrity of the fire-resistant construction and/or cavity barriers. In addition to the installation of these services and drainage, a verifiable inspection and certification procedure for the integrity of the fire-resistant construction is required for submission at the completion of the Works.

Katy Reed

Published 4 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline unknown