Reactive Building Maintenance

Award

Value

£0

Suppliers

Classifications

  • Repair and maintenance services of building installations

Tags

  • award
  • contract

Published

3 years ago

Description

The Council are looking to appoint a contractor to provide a Reactive Building Maintenance and Repair Service. There may also be an opportunity, subject to performance; to be invited to quote for other minor building works contracts. The appointed contractor will be required to provide a 24 hour service to all Bracknell Forest Council premises including schools.Typically repair work will include roof repairs, clearing blocked drains, electrical repairs, plumbing, carpentry, glazing, decorating and other minor day to day repairs. Work will be prioritised into three categories, 2 hour maximum response on emergency or health & safety (life threatening) situations, 4 hour maximum response for urgent but non-emergency work and 4 days for all other work required.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

The Service and Maintenance of Automatic Doors

Swindon Borough Council are looking to engage with an experienced contractor to provide responsive and scheduled bi-annual maintenance of its automatic doors. The Council expects the contractor to repair any faulty automatic doors as and when required, with an all-inclusive service. This all-inclusive service should include all call out, fault investigation, repairs, labour and materials, travel and related costs during the duration of the contract. It should be noted that the contract shall comprise of the inspection, ongoing maintenance and repair of automatic doors, both planned servicing and also remedial works are within the scope of this contract. This will be required 24 hours, 7 days a week (including weekend and Bank Holidays) working. The contract will be for a period of 3 Years with an optional 2 year extension period and is estimated to commence 1st April 2026. Estimated contract spend is between £250,000.00 - £270,000.00 ex vat across the initial 3 year term and £415,000.00 - £450,000.00 across the full 5 year term. Full details relating to the services are provided in the tender documents. To participate, Suppliers will need to Register as a Supplier with ProContract, www.supplyingthesouthwest.org.uk, then Register an Interest before obtaining access to the tender documents. In the event of difficulties registering as a supplier, please refer to the System Administrator Proactis support team [email protected] Tender clarifications to be submitted in writing via Messaging in ProContract tender portal by 7th November 2025 15:00 hrs UK Local time. The Council’s responses to these clarification questions will be issued periodically on the ProContract tender portal. Tender Responses are required to be submitted no later than 17th November 2025, 15:00 hrs UK Local time via ProContract tender portal - https://www.supplyingthesouthwest.org.uk/ Supplying the South West Portal, https://www.supplyingthesouthwest.org.uk/ is the only portal that includes all the relevant documents required to respond to this opportunity, bearing Project Id: DN794509 No Tender submissions will be considered without completing the tender documents in full including attachments and returning them in alignment with the instructions within the tender documents.

Katy Reed

Published 1 hour ago
Open

Broomhills Pavilion Upgrade

1 Site Location Broomhills Pavilion is located adjacent to playing fields at the top of Broomhills Lane Repton DE65 6FS The building is of brick and tile, single storey construction. Services provided are three phase electricity, water and sewerage. All existing room heating arrangements are to be retained. It is envisaged that bidders will need to undertake a detailed inspection of the existing building. Details for the arrangement of site visits are given in section 5 below. 2 Scope of Supply The contract will require the completion of all works associated with the following listed requirements. 2.1 Building 2.1.1 Inspect and repair any defective areas of the roof covering. 2.1.2 Replace all gutters and downpipes. 2.1.3 Replace Insulation. 2.1.4 Install thermal expansion joint in south wall and make good cracked brickwork. 2.1.5 Provide Wheel Chair Access to Main Door 2.1.6 Provide simple canopy over main entrance from entrance doors to the front of the building but not extending beyond building. 2.1.7 Entrance external light and switch with delay switch off 2.2 Plant & Equipment Room 2.2.1 Removal of existing plant & equipment providing hot and cold water to showers, washbasins and kitchen. 2.2.2 Provide a suitable energy efficient, electrical water heating arrangement to supply the refurbished building. 2.2.3 Provide lockable enclosure covering electric supply and main switches. 2.2.4 Modify old plant room to provide a change facility for Match Official with washbasin, toilet etc. 2.2.5 Install tiling where appropriate and decorate throughout. 2.3 Main function room (Existing electrical heating units to be retained) 2.3.1 Repair floorcovering as required. 2.3.2 Create serving counter to adjoining kitchen area with storage units under the counter. 2.3.3 Make good all surfaces. 2.3.4 Replace skirting and architraves where necessary. 2.3.5 Replace frosted Glass in double doors upper sections with suitable clear glass 2.3.6 Provide window in west wall (2.5m x 1.2m) double glazed glass, lockable. 2.3.7 Decorate throughout. 2.4 Kitchen 2.4.1 Replace all units and provide double sink, large frig and dishwasher only. (No cooking appliances required) 2.4.2 Units to include one tall cupboard suitable for cleaning apparatus and equipment. 2.4.2 Install tiling where appropriate and decorate throughout. 2.5 Reception area 2.5.1 Remove existing cupboards. 2.5.2 Make good all surfaces. 2.5.3 Replace internal doors with safety glass and compliant fire-resistant doors as required. 2.5.4 Provide tall lockable storage cupboard for RPC use, to south of main doors. To include a double electrical power socket. (CCTV recorder position) 2.5.5 Decorate throughout. 2.6 Toilets 2.6.1 Remove existing toilets and replace with two accessible toilets in each block, to include required ventilation. (FA Guidance) 2.6.2 Tile as required and decorate throughout. 2.7 Shower & Changing Rooms 2.7.1 Provide proposals for a modern shower installation to replace existing arrangements. 2.7.2 Refurbish existing tiled floors. 2.7.3 Install suitable ventilation. 2.7.4 Install / repair tiling where appropriate. 2.7.5 Make good ceilings suitable for shower / changing room environment. 2.7.6 Provide small key lockable box / safe for each changing room. 2.7.7 Decorate throughout. 2.8 Electrical (note current emergency lighting system and safety equipment is considered satisfactory) 2.8.1 Ensure existing electrical installation and wiring meets current building standards and IEE regulations, replace and rewire as necessary. 2.8.2 Beyond the requirements listed above, ensure there are double 13 Amp sockets - two in east side wall of the main function room, two on main function room wall next to the entrance, one on west wall of main function room (one suitable for use on the new counter, two on each long wall of the kitchen, 2.8.3 Replace all lights with LED lights as required. 2.8.4 Provide ducting / cabling / terminal boxes for potential CCTV cameras and LED lights at the four corners of the building to the lockable cupboard in the reception area.

Katy Reed

Published 6 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete