Ardersier Port, Phase 2 - Landside Civils

Open

Value

£10,000,000

Classifications

  • Construction work

Tags

  • tender

Submission Deadline

1 month from now

Published

1 hour ago

Description

These works are the focus of this PQQ.
Proposed development of the yard area to a varying finished ground level to suit the drainage design and to tie into that of Phase 1, including removal of existing trees and raising of the land using existing material on site while achieving a load bearing capacity of 250kPat/m2.
Works will include, but not limited to, the following within the approximately 100 acres gorse area:
-Earthworks:
-     Tree clearance and screening
-     Stripping and disposal of existing topsoil material to extension area.
-     Upfilling the extension and yard areas to level with site-won sand.
-     Ground Strengthening:
-	Capping of the extension and yard areas with stone to 25t/m2.
-Services Civils Works
-	Rerouting and undergrounding of the existing incoming overhead power supply.
-	Rerouting of existing incoming water main supply.
-	Rerouting of existing drainage ditch in yard area around the new perimeter of the site and passive drainage, like the Phase 1 philosophy, across the site.
-Services Mechanical & Electrical Installations
-	Rerouting and undergrounding of the existing incoming overhead power supply;
-	Rerouting of existing incoming water main supply;
-	Rerouting of existing drainage ditch in yard area around the new perimeter of the site and passive drainage, like the Phase 1 philosophy, across the site;
At present we do not have a defined requirement or design for street lighting and it is therefore not included within the current procurement scope. It is possible that a limited street-lighting requirement may emerge at a later date; given the likely scale and the close interface with the Landside Civils works, it may be more efficient for any such requirement to be delivered by the Landside Civils contractor, but only where a modification on that basis is permitted under the Utilities Contracts (Scotland) Regulations 2016.
There may be a requirement for the Contractor to coordinate elements of works with the Clients quayside civils contractor.
The Client provides the bidder with the option to submit a variant tender should they be invited the Stage 3 – Invitation to Tender.
The variant tender reflects the same works above but within the Gorse & Woodland Area in an approximately 250 acres site area. The information about variants shall be clearly defined within the procurement documentation.

Similar Contracts

Open

PfH - Responsive Repairs, Disrepair Works and Void Services

Established in 2004, Procurement for Housing (PfH) is a national procurement consortium dedicated to the social housing sector and supported by the National Housing Federation (NHF), Chartered Institute of Housing (CIH) and HouseMark. Collectively our Members manage more than 90% of UK' social housing stock, with PfH helping them to achieve efficiency savings using a wide range of services including framework agreements, dynamic purchasing systems, spend analyses, strategy reviews, consolidated billing and comprehensive reporting. PfH is a contracting authority under section 2 of the Procurement Act 2023 and a centralised procurement authority under section 1(4) of that Act. Please refer to www.pfh.co.uk for additional information. PfH is administered by Inprova Limited and is headquartered in the North West of England with over 20 years of expertise and experience offering a complete procurement solutions package across outsourcing, technology and consultancy. By integrating procurement services and technology, Inprova operates as a delivery partner, supporting business performance improvement for the public sector. PfH is seeking suitably qualified and experienced suppliers to join the framework for Responsive Repairs, Disrepair Works and Void Services. The framework will cover Responsive Repairs and Void Property Refurbishment, Void Property Refurbishment, Responsive Repairs, Disrepair Works, Void Property Cleaning & Clearing, Security Services, Pest Control and associated services.

Katy Reed

Published 1 hour ago
Open

Minor Engineering Works Framework Contract 2026-2030

A framework agreement covering the period from April 2026 to March 2030 to deliver civil and structural engineering works associated with the expansion, improvement, and maintenance of Devon County Council's highway, cycleway, waste management, flood risk management and structures assets including, without limitation, the following types of schemes: • Highway maintenance, improvement and new construction. • Bridges and structures maintenance, improvement, inspection and new construction. • Slope stabilisation and retaining walls. • Walking and cycling. • Multi-use trails. • Traffic management and traffic signals. • Waste management including recycling centres and works on redundant landfill sites. • Highway depots. • Flood and coastal risk management. • Car park, park and ride / change. • Public transport, bus priority and passenger transport. • Public realm/town centre enhancement The framework will consist of 6 (six) Lots as follows (values are excluding VAT): Lot 1: Highways Work Orders ≤ £200,000 (Six Suppliers) Lot 2: Structures Work Orders ≤ £200,000 (Six Suppliers) Lot 3: Highways Work Orders > £200,000 and ≤ £1,000,000 (Six Suppliers) Lot 4: Structures Work Orders > £200,000 and ≤ £1,000,000 (Six Suppliers) Lot 5: Combined Structures and Highways Work Orders >£1,000,000 and ≤ £4,000,000 (Eight Suppliers) Lot 6: Rail Interface Structures Work orders Orders up to £1,500,000 (Two Suppliers). The framework will be carried out under the terms and conditions of the NEC4 Framework Contract June 2017 and any additional conditions of contract. Work Orders will be carried out under the terms and conditions of the NEC4 Engineering and Construction Contract June 2017 (with amendments January 2023) and any additional conditions of contract. The number of schemes that will be issued through the framework is currently unknown. Spend for the total framework is identified below, with historic spend data contained within the supplementary information found in Volume 8 of the procurement documents.

Katy Reed

Published 4 hours ago