Initial Refurbishment, Maintenance and Service for Gas Engines / Gensets ITT

Complete

Buyers

Value

£2,000,000

Classifications

  • Gas appliance maintenance services
  • Repair and maintenance services of generators

Tags

  • tenderUpdate

Submission Deadline

1 week ago

Published

3 weeks ago

Description

Lancashire Renewables Limited (LRL) was established for the operation and management of two central waste treatment facilities. LRL's key objectives are to receive, treat and transport contract waste in accordance with the targets and service requirements set out in the Service Level Agreement between the company and its majority shareholder, Lancashire County Council.
Each of LRL's two waste treatment facilities is designed to process and handle various municipal waste types arranged and supplied by Lancashire County Council and Blackpool Council. From April 2026, this means that source separated food waste from Lancashire's Households will be transported for processing into LRL's site based at Farington, Leyland (PR26 6TB).
Until 2014, LRL had an anaerobic digestion (AD) process in operation. The inputs came from residual 'black bin' household waste with organics separated via rotating trommels and metal separation. Waste was then fed into pre-treatment technologies before the organic soup produced was fed into the anaerobic digestion process. Gas produced from the process was pre-treated to remove hydrogen sulphide and other undesirable compounds before being fed into a gas storage vessel prior to use by the power generation infrastructure. The biomethane supplied two MWM TCG 2020K V12 engines with fuel to generate electricity which was then used on-site rather than exported into the grid.
The historical AD pre-treatment process was inefficient and expensive to run. As a result, the process ceased to operate in 2014 and the associated areas were put in a state of preservation and mothballed. It is estimated that the gas engines were only used for approximately 10000 hours prior to being decommissioned, having being installed circa 2010.
As household source-separated food waste collections in England are mandatory from April 2026, LRL is looking to recommence a new AD process at its site based at:
Lancashire Renewables Limited
Farington Waste Recovery Park
Sustainability Way
Leyland
PR26 6TB
To facilitate this, 2 no. gas engines / gensets are required to be brought back into operational service at LRL's Leyland site. Therefore, the contract will include offsite initial refurbishment, delivery back to site, installation and testing, followed by ongoing service and maintenance. It is likely that the initial refurbishment and install back on site of the two gensets must be completed by 31/03/2026.
It is possible that the same works may be undertaken, and hence the contract could require an additional 2 no. gas engines / gensets of the same manufacturer and model at LRL's Thornton facility. The contract will include provision for this, although it is to be decided at a later date whether this will be exercised.

Similar Contracts

Open

Milnbank Housing Association - Two Year Gas Servicing and Legionnaires Disease Risk Assessment Contract

The Contract primarily involves Gas Servicing throughout tenant occupied properties within the Dennistoun and Haghill areas of Glasgow. The Contract will also include Legionnaires Disease Risk Assessment’s which will be undertaken to all properties at the same time as each annual gas service. The Legionnaires Disease Risk Assessments will exclude an inspection of water storage tanks and bidders are advised that Milnbank Housing Association have bypassed all common water storage tanks to flats within ownership of Milnbank Housing Association, which are all connected to a mains fed water supply. Bidders are further advised that they will not be required to enter loft spaces (including loft spaces above common close areas) during the contract as Milnbank Housing Association currently have a specialist Contractor who undertakes inspection’s of common water storage tanks to mixed tenure or fully factored blocks. It is also envisaged that any repair or follow up work’s identified by the Contractor’s Legionnaires Disease Risk Assessment’s undertaken during this contract will be carried out by Milnbank Housing Association’s existing specialist Contractor and not the Contractor that is successful in bidding for this opportunity. The Contract duration is two years (twenty-four months) from the commencement date of 1st April 2026 until 31st March 2028, and will primarily include an annual gas service and reactive maintenance (including parts) and Legionnaires Disease Risk Assessment’s to each property, the recording, testing and service to existing smoke, heat and CO detectors. The proposed works may also include the variation unquantified Modelcodes described within Tender Documents 2 (Pricing Matrix) and 6 (Activity Schedule). Subject to satisfactory performance of the Contractor, which will be assessed through measurement of the Key Performance Indicator’s (Refer Tender Document 8) it is intended that the Contract will be further extended annually in twelve months increments up to a maximum of three years and an overall maximum contract period of five years.

Open

Site Emergency Generator Maintenance

1. Project Objectives/Background 1.1. The contract is for a single supplier to provide Maintenance and Servicing to the Institute’s Standby generators. 2. Scope 2.1. In the event of failure to critical infrastructure the Institute must be able to rely on swift engineering attendance with diesel generators and associated cabling in a range from 500kVA to1500kVA engines within time measure associated with a high containment site. Suggested time frame is 4 hours between callout and site attendance. 2.1.1. Each generator requires two service visits per year, one minor and one major visit. 2.1.2. We expect to be advised of if any of the generators require changing or replacing items such as Oil require testing samples to verify this change. Oil/Air and fuel filters, coolant, Oil, fuel lines, fuel quality, plugs, leads etc. Service dates to be set out in advance between the Pirbright maintenance scheduler and company contact. Several visits may have to be arranged due to our building shutdown schedule so it may not be possible to service all the engines in one continuous site visit. It is also suggested that the site has a dedicated engineer who would seek to attain security clearance for the site so as to work independently of engineering services escorting engineers and to have a skill level where they are able to sign on and off work permits in advance and following servicing or breakdown or extra to contract works. 2.1.3. One essential requirement is to ensure power supplies remain on at all times, this is achieved through a series of UPS’s DRUPS and standby generators. 2.1.4. Subcontractors are expected to attain a high standard of maintenance, conducting themselves with professionalism and having an attitude of continuous improvement. The generator engineer will be reporting and working alongside the Site Electrical Supervisor to structure building “On/Off load” testing and maintenance. 2.1.5. It is preferable that the site has a dedicated maintenance engineer and a deputy who are security cleared to “Contractor Pass” level after site familiarisation and operation.