Major Refurbishment of Port Ellen Lighthouse

Open

Buyers

Value

£150,000

Classifications

  • Fabrication work
  • Painting and glazing work
  • Restoration work

Tags

  • tender

Submission Deadline

1 month from now

Published

16 hours ago

Description

The primary objective of this project is to complete a full refurbishment of Port Ellen Lighthouse to preserve its structural condition, meet current safety standards, and maintain the reliable operation of the Aids to Navigation.
The works will deliver a full internal and external repaint in line with the 10-year maintenance cycle, carry out essential repairs to metalwork, masonry, doors, windows and safety systems, and address any emerging defects. The outcome will extend the service life of the asset, reduce reactive maintenance requirements, and support a safe and functional environment for inspections and planned interventions.
The works will be delivered with minimal disruption to operational services and in accordance with Northern Lighthouse Board procurement procedures and project governance requirements.
Scope of contract
This contract covers the full refurbishment of Port Ellen Lighthouse. The works include internal and external painting, repairs to masonry, metalwork, windows, doors, and other fabric elements, as well as servicing or replacement of access and safety fittings. This is a one-off project aimed at extending the operational life of the lighthouse and reducing future maintenance requirements.
Details of What Is Being Procured
The contract will include:
•Fabrication of replacement footbridge.
•Mobilise to site and establish welfare facilities.
•Set up the site.
•Dismantle/ remove the existing footbridge.
•Install replacement footbridge.
•Remove redundant solar array support beams.
•Carryout ventilation improvements.
•Fabricate and install storm windows.
•Remove external cable tray.
•Prepare and redecorate the tower internally.
•Prepare and redecorate the tower externally.
•Replace existing rainwater goods.
•Clear the site.
Please note that there will be a site visit to allow Tenderers to view the works required prior to the closing date. It is important that Tenderers or their representative(s) attend the site visit, any Tenderers submitting a tender that have not attended the site visit, will not be considered. Site visit will be conducted 25 November 2025. Please request a site visit via Delta eSourcing and provide names, mobile numbers of representatives attending site
To view this notice, please click here: 
https://nlb.delta-esourcing.com/delta/viewNotice.html?noticeId=991940463

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Major Refurbishment of Port Ellen Lighthouse

The primary objective of this project is to complete a full refurbishment of Port Ellen Lighthouse to preserve its structural condition, meet current safety standards, and maintain the reliable operation of the Aids to Navigation. The works will deliver a full internal and external repaint in line with the 10-year maintenance cycle, carry out essential repairs to metalwork, masonry, doors, windows and safety systems, and address any emerging defects. The outcome will extend the service life of the asset, reduce reactive maintenance requirements, and support a safe and functional environment for inspections and planned interventions. The works will be delivered with minimal disruption to operational services and in accordance with Northern Lighthouse Board procurement procedures and project governance requirements. Scope of contract This contract covers the full refurbishment of Port Ellen Lighthouse. The works include internal and external painting, repairs to masonry, metalwork, windows, doors, and other fabric elements, as well as servicing or replacement of access and safety fittings. This is a one-off project aimed at extending the operational life of the lighthouse and reducing future maintenance requirements. Details of What Is Being Procured The contract will include: •Fabrication of replacement footbridge. •Mobilise to site and establish welfare facilities. •Set up the site. •Dismantle/ remove the existing footbridge. •Install replacement footbridge. •Remove redundant solar array support beams. •Carryout ventilation improvements. •Fabricate and install storm windows. •Remove external cable tray. •Prepare and redecorate the tower internally. •Prepare and redecorate the tower externally. •Replace existing rainwater goods. •Clear the site. For more information about this opportunity, please visit the Delta eSourcing portal at: https://nlb.delta-esourcing.com/tenders/UK-UK-Edinburgh:-Fabrication-work./58582B427Z To respond to this opportunity, please click here: https://nlb.delta-esourcing.com/respond/58582B427Z

Katy Reed

Published 1 day ago
Open

Removal of Existing Conservatory & Associated Works - Richmond House, Richmond Park, Gainsborough

Gainsborough Town Council invites tenders for the careful removal of an existing glazed conservatory and associated restoration works to the Grade II listed Richmond House, located within Richmond Park, Gainsborough. Works include demolition, masonry repair, joinery, sash window manufacture and installation, internal making good, decoration, and compliance with planning and heritage conditions. 1. Programme & Site Access • Contractor to supply a proposed programme of works for approval before commencement. • Access routes and site arrangements must be coordinated to avoid unnecessary disruption to site users and maintenance operations. ________________________________________ 2. Planning & Consent Conditions All works must be undertaken in accordance with the following approved drawings: • Ref: RD:5236 - 04 Rev A (June 2024) - Existing Site Plan • Ref: RD:5236 - 03 Rev C (June 2024) -Plan and Elevations • Ref: RD:5236 - 07 Rev B (June 2024) - Window Details for Reception and Office. • Ref: RD:5236 - 08 Rev B (June 2024) - Site Plan (Extension & Window Details Only). Condition 3 - Masonry Samples • No new masonry to be installed until brick and stone samples have been submitted to and approved by the Local Planning Authority (LPA). • Samples to include a test panel of brickwork (type, bond, mortar, finish) and proposed sills and heads. Condition 4 - Window & Joinery Drawings • Prior to installation, 1:20 scale drawings to be submitted for approval, showing materials, finishes, protective coatings, cross-sections, glazing details, and colour proposals. Condition 5 - Brickwork Cleaning • Method Statement to be submitted for approval before commencement of any brick cleaning, in compliance with BS 8221-1:2012. • Works must strictly follow the approved methodology. ________________________________________ 3. Description of Works 3.1 Demolition of Existing Extension • Carefully dismantle the glazed extension to prevent damage to the main structure and surrounding site. • All arising debris to be cleared and disposed of in accordance with regulations. 3.2 Removal of Base and Floor Construction • Break out the existing slab and base down to the level of adjoining paving. • Dispose of waste safely and responsibly. 3.3 External Wall Alterations • Remove render, plaster, and paint to walls affected by removal of structure. • Repoint brickwork with lime-based mortar. • Rebuild external wall sections as required, forming new window openings with matching lintels and sills. 3.4 Timber Sash Windows • Manufacture and install two new hardwood sliding sash windows to replicate the original appearance. • Include sash weights, ironmongery, and detailing in line with existing style. • All units to comply with approved drawings. 3.5 Internal Making Good • Repair disturbed walls, ceilings, and joinery to match existing finishes. • Apply lime plaster to walls and ceilings. • Use joinery-grade softwood for replacement or repairs. 3.6 Decoration & Finishes • Prepare and paint all new plasterwork and joinery. • Paint sash windows internally and externally. • Decorate affected doors and frames, with colour schemes approved in advance. 3.7 Site Management & Documentation • Provide temporary site facilities, security, and welfare as necessary. • Submit RAMS, Construction Phase Plan, and maintain a Health & Safety File in compliance with CDM. ________________________________________ 4. Quality & Standards • All works to be executed to a high standard of craftsmanship. • All materials must be new, high quality, and consistent with the historic character. • Works must comply with: o National heritage and listed building policies. o Relevant British Standards and current Building Regulations. o Health & Safety legislation. ________________________________________ 5. Completion & Handover • At practical completion, provide warranties, certification, and maintenance instructions. • Leave the site tidy and free from construction waste.

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete