Installation of Air Source Heat Pump System at Fleetdown Community Centre, Dartford

Open

Buyers

Value

£0

Classifications

  • Electricity, heating, solar and nuclear energy
  • Heating equipment
  • Heating, ventilation and air-conditioning installation work
  • Central-heating installation work
  • Boiler installation work

Tags

  • tender

Submission Deadline

3 weeks from now

Published

3 hours ago

Description

Remove radiators and cap pipework supply and install air source heat pumps and external condenser units at Fleetdown Community Centre, Dartford.
For more information about this opportunity, please visit the Delta eSourcing portal at: 
https://www.kentbusinessportal.org.uk/tenders/UK-UK-Dartford:-Electricity%2C-heating%2C-solar-and-nuclear-energy./9G86YAMRN5
To respond to this opportunity, please click here: 
https://www.kentbusinessportal.org.uk/respond/9G86YAMRN5

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Replacement heating and mechanical plant

The works involved in this project consist of the replacement of the heating plant and general replacement of mechanical plant within the plant room. The heating plant consists of 3no. condensing units serving 3no. hyrdroboxes, a domestic hot water cylinder and pipes, pumps and ancillaries, protective cages, controls, insulation, valves, sensors etc. The final installation shall provide for good access to provide easy maintenance and potential to remove and replace all plant. Plant should not be installed in locations where access is restricted or difficult. Allow to include for all the BMS, electrical and builders work associated with the mechanical services contract and detailed in this specification and as shown on the drawings. Electrical works are detailed within the this specification. Installed and commissioned to latest issues of relevant British Standards, Water Regulations and Gas Safety Regulations. The contractor shall develop the construction phase drawings in electronic (dwg) format using the current architectural layout. As-built drawings shall be provided to the client as part of the O&M information upon completion of the project. The contractor is responsible for providing the following content or documentation as part of the project construction: 1. Develop the Stage 4 Tender Design into a fully co-ordinated Stage 5 Construction Documentation package 2. Check the provision for and accuracy of the builder's work information issued prior to the award of the contract 3. Detail the final or supplementary builders work information based on manufacturers or sub-contractors design orco-ordination information and provide fully dimensioned drawings. 4. Detail all access requirements, including access in false ceilings, for maintenance & cleaning and provide fullydimensioned and annotated drawings. 5. Design and undertake all acoustic and fire stopping required to facilitate the works 6. Ensure adequate pipework fall gradients are provided. 7. Ensure suitable access to all valve and plant locations for easy access of maintenance personnel. 8. Prepare detailed electrical wiring diagrams of all equipment supplied showing all interconnections between equipment to enable all wiring installations to be undertaken. 9. Ensure sizes indicated on the detailed design information are not invalidated by the selection of alternative routes during co-ordination or selection of alternative manufacturer's equipment. 10. Ensure all alternative proposals including value engineering exercises are fully designed before submitting forapproval. 11. Note and advise the main contractor of all acoustic and fire stopping required to facilitate the works. 12. Any changes to the detailed design drawings and information required as part of a variation or change from specification post contract award shall be undertaken by the contractor and information issued to the CA for approval/comment. 13. Design, supply and install all rectangular builders work openings with both dimensions less than or equal to 200mmand all round builders work openings with a diameter of less than or equal to 200mm.

Katy Reed

Published 4 days ago
Open

The Flexible Procurement and Supply of Half Hourly Electricity

FPA Consulting Limited (FPA) have been appointed By Associated British Ports Limited (the Authority) to provide advice and facilitate the procurement of Half Hourly Electricity on its behalf. FPA will not be a principal to any subsequent Contract and accepts no liability for the acts or omissions of the Authority with respect to the Contract. The Authority wishes to appoint a suitably qualified supplier or consortium on a single Lot basis to support it with the Flexible Procurement and Supply of Electricity across the Authority's estate. The Authority purchases approx. 135 GW of Half-Hourly (HH) electricity per annum across circa 115 settled meters via a flexible trading supply agreement. The current purchasing arrangement has been in place from June 2024 for supplies commencing 1st April 2026 to 31st March 2027. The Authority wishes to put in place new flexible HH electricity trading arrangement which will allow it to undertake HH electricity trading before the expiry of the current arrangements. The Contract will cover the supply period from 1st April 2027 to 31st March 2030, with the option to extend the contract terms for a further 3 years (3+3 arrangement). The Authority retains the flexibility to decide upon any extension term throughout the initial Contract term. Any extension period must be mutually agreed and will not be subject to automatic renewal. All supply contracts under this agreement will terminate at the end of the agreed term and the supplier will not automatically renew supply arrangements without express written agreement from the Authority. This does not prevent the supplier Bidder from applying out of contract supply rates at the end of any agreed supply contract term. The key aims of this procurement for the flexible Procurement and Supply of Electricity are to:- • Provide the ability for the Authority to trade volumes of electricity from the Contract award date, in readiness for the start of the supply Contract • Provide the ability for the Authority to 'sleeve in' pre-executed trades at the commencement of any resultant supply contract. • Allow the Authority to procure 100% zero-carbon energy, backed by Renewable Energy Guarantee of Origin certification and/or 100% independent third party certified/accredited zero-carbon energy, for 100% of energy consumed by the Authority during the term of the supply contract. Further information, including site details and consumption data are included within the ITN documentation.

Katy Reed

Published 5 days ago
Open

Replacement heating and mechanical plant

The works involved in this project consist of the replacement of the heating plant and general replacement of mechanical plant within the plant room. The heating plant consists of 3no. condensing units serving 3no. hyrdroboxes, a domestic hot water cylinder and pipes, pumps and ancillaries, protective cages, controls, insulation, valves, sensors etc. The final installation shall provide for good access to provide easy maintenance and potential to remove and replace all plant. Plant should not be installed in locations where access is restricted or difficult. Allow to include for all the BMS, electrical and builders work associated with the mechanical services contract and detailed in this specification and as shown on the drawings. Electrical works are detailed within the this specification. Installed and commissioned to latest issues of relevant British Standards, Water Regulations and Gas Safety Regulations. The contractor shall develop the construction phase drawings in electronic (dwg) format using the current architectural layout. As-built drawings shall be provided to the client as part of the O&M information upon completion of the project. The contractor is responsible for providing the following content or documentation as part of the project construction: 1. Develop the Stage 4 Tender Design into a fully co-ordinated Stage 5 Construction Documentation package 2. Check the provision for and accuracy of the builder's work information issued prior to the award of the contract 3. Detail the final or supplementary builders work information based on manufacturers or sub-contractors design orco-ordination information and provide fully dimensioned drawings. 4. Detail all access requirements, including access in false ceilings, for maintenance & cleaning and provide fullydimensioned and annotated drawings. 5. Design and undertake all acoustic and fire stopping required to facilitate the works 6. Ensure adequate pipework fall gradients are provided. 7. Ensure suitable access to all valve and plant locations for easy access of maintenance personnel. 8. Prepare detailed electrical wiring diagrams of all equipment supplied showing all interconnections between equipment to enable all wiring installations to be undertaken. 9. Ensure sizes indicated on the detailed design information are not invalidated by the selection of alternative routes during co-ordination or selection of alternative manufacturer's equipment. 10. Ensure all alternative proposals including value engineering exercises are fully designed before submitting forapproval. 11. Note and advise the main contractor of all acoustic and fire stopping required to facilitate the works. 12. Any changes to the detailed design drawings and information required as part of a variation or change from specification post contract award shall be undertaken by the contractor and information issued to the CA for approval/comment. 13. Design, supply and install all rectangular builders work openings with both dimensions less than or equal to 200mmand all round builders work openings with a diameter of less than or equal to 200mm.

Katy Reed

Published 1 week ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete