ACIS Group - Path and Driveway Repairs

Award

Value

£720,000

Classifications

  • Construction work

Tags

  • award

Submission Deadline

3 months ago

Published

1 month ago

Description

The works include path and driveway repairs and/or replacements and associated repair works to be carried out to properties that are owned/managed by the Employer within the contract area.

The Contract is let on a JCT Measured Term Contract 2016 basis with a contract term of 12 months commencing on the 1st November 2025 with an option to extend the contract of up to a further 3nr 12 months extensions up to the 31st October 2029, at the absolute sole discretion of the Employer.

There is no volume or workflow guarantee, but indicatively it is anticipated that orders for works between £0.00-£180,000 per annum may be issued vis this contract.

This underlying contract is awarded via Direct Award from lot 10A (Paving and External Works) (Yorkshire and Humberside) of the EN:Procure Framework Agreement for the Provision of Installation, Servicing, Repairs & Maintenance (4th Generation) dated 26th February 2024. (OJEU Contract Notice 2023/S 000-019535)

Similar Contracts

Open

HVAC at Energy House 1

1.1.1 The University of Salford (UoS) is a leading public institution located in Greater Manchester, UK, with a strong reputation for combining academic excellence and industry engagement. Established in 1967, it serves over 20,000 students across undergraduate, postgraduate, and research programs. Salford is recognised for its close ties to industry, particularly in media, health, engineering, and digital sectors, supported by its strategic location adjacent to MediaCityUK. 1.1.2 The University operates two unique research facilities: Energy House 1 and Energy House 2.0. Both facilities contain environmental climate chambers that house test buildings. Energy House 1, located in the Cockcroft building, features a Victorian End Terrace House and was the first of its kind when constructed. The chamber enables the simulation of a wide range of European weather conditions, allowing for the testing of construction products and heating systems under controlled conditions environments. The environmental chamber has a dedicated heating and ventilation and air conditioning (HVAC) system. 1.1.3 After more than 10 year in operation, Energy House 1 is experiencing maintenance and performance issues with its existing HVAC system. Over time, both testing methods and the technologies under evaluation have evolved. For example, the introduction of Air Source Heat Pumps (ASHPs) has created new requirements for humidity control. The majority of work performed at Energy House 1 involves replicating outside temperature experienced during the UK heating season (-5 °C to +15 °C). Clients also express interest in performing research in extreme winter and summer conditions (-10 °C to +40 °C).

Katy Reed

Published 11 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete