4 no 2 man pothole defects - Tender 1

Award

Value

£265,040

Classifications

  • Road-maintenance works

Tags

  • award

Submission Deadline

4 weeks ago

Published

5 days ago

Description

Planned programme of pothole defect works

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Invitation to Tender for Cantick Head Road Access Improvements

Description of Works Cantick Head Lighthouse is accessed via a privately owned, single-track, unsurfaced road located beyond the end of the B9047 public road on South Walls, Orkney. The road provides the only vehicular route to the lighthouse and adjacent residential properties. The site is operational, with mains power and road access. The road has deteriorated significantly over time due to weathering and lack of maintenance. It has now reached a condition that has been deemed unsuitable for safe vehicle passage. Notably, the Scottish Ambulance Service has recently advised that the road is currently impassable for their vehicles, posing a significant risk to nearby residents. This project represents a targeted civil works intervention to regulate and resurface the road from the lighthouse to the mound, including the lighthouse dwelling driveway. These works are intended to ensure long-term vehicular access and address a pressing health and safety concern. The works include surface regulation, overlay with a new asphalt layer, and necessary site mobilisation and clearance. It is a one-off project intended to improve safety, meet legal maintenance obligations, and reduce the risk of emergency vehicle inaccessibility. The contract will include: •Mobilisation and establishment of any temporary site facilities required •Regulation of the existing road surface using imported material where necessary •Laying of a new 50mm AC14 bituminous surface layer across the access road (width not exceeding 3m) •Resurfacing of the lighthouse dwelling driveway area •Final site clearance and reinstatement Programme The contractor must submit a works programme, at tender stage with proposed start dates for the sequence of works within this project. It is anticipated that the programme of scheduled works for this project will start on 1 December 2025, with an expected duration of 3 weeks, completing by 19 December 2025. A more detailed programme of work will be agreed between the NLB and the successful contractor. For more information about this opportunity, please visit the Delta eSourcing portal at: https://nlb.delta-esourcing.com/tenders/UK-UK-Edinburgh:-Road-maintenance-works./9F65YC5M38 To respond to this opportunity, please click here: https://nlb.delta-esourcing.com/respond/9F65YC5M38

Katy Reed

Published 6 hours ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline complete

Publish
Bid
Evaluate
Award
Complete