Aberystwyth Coastguard Rescue Station (CRS) - Fire Escape Reconfiguration

Open

Buyers

Value

£50,000

Classifications

  • Building construction work
  • Fire-prevention installation works

Tags

  • tender

Submission Deadline

2 weeks from now

Published

1 day ago

Description

Fire escape reconfiguration works identified after the latest Fire Risk Assessment was conducted.

Documents

Premium

Bypass the hassle of outdated portals. Get all the information you need right here, right now.

  • Contract Agreement

    The official contract terms, conditions, and scopes of work.

    Download
  • Award Notice

    Details on the tender award and selected suppliers.

    Download

Similar Contracts

Open

Main Contractors Framework 2026

LSHTM Framework for Main Contractors, to procure works across all campuses of its estate, broken out into the following Lots: Lot 1 – Main Contractor - Carry out construction projects, either as traditional single stage or design and build. Lot 2 – Mechanical, Electrical and Public Health (MEP) Contractor – Predominantly in relation to either large plant replacement, or large scale replacement of for instance light fittings, or distribution pipework but may also cover simple external and internal refurbishment works. With an estimated total value of LSHTM capital projects over the life of the Framework of between £15,000,000 and £63,000,000 GBP based on up to £60,000,000 for lot 1 and up to £3,000,000 for lot 2. These figures cannot in any circumstances be guaranteed and nor should they be taken as a minimum or maximum amount. Typical call-off contract values range from £250,000 - £10,000,000 for lot 1, and £10,000 to £150,000 for lot 2. Please note that refurbishment work in the laboratories is of a highly technical nature, requiring extensive relevant skills and experience. In addition, the refurbishment works generally take place in occupied buildings with other research activities ongoing nearby, requiring careful planning and execution of the works so that no research is interrupted. Due to the criticality of these research activities an ability to react and resource promptly to address technical issues that threaten research continuity is required.

Katy Reed

Published 1 day ago
Open

Fire Alarm Upgrades to 14 Supported & Sheltered Housing Schemes

The appointment of a contractor for Fire Alarm Upgrades to 14 Supported & Sheltered Housing Schemes Project Description Swindon Borough Council (SBC), wishes to submit to tender the requirements for the provision of a fire systems contractor who will be responsible for the end-to-end process of ensuring that fire alarm systems are correctly installed, configured, and operational in accordance with the requirements of this specification, industry standards and regulatory requirements to 14 supported and residential Housing schemes SBC have previously commissioned a specialist consultant to design fire alarm systems for SBC sheltered and supported housing schemes to meet L1 and LD1 grade A requirements. These designs have now been taken up-to concept/spatial design stage (RIBA 3) identifying the component locations, wiring loops for the alarm systems and performance parameters. We now seek to appoint a specialist contractor to carry on from the consultants RIBA 3 (developed design) stage, from RIBA stage 4 Technical design through, the supply/manufacture, installation, handover and use of a compliant operational fire alarm system (RIBA stages 4-7). This design shall incorporate the grading requirements of the fire alarm system, as well as remote monitoring and testing abilities identified within the Initial concept design. The contract will be for a period of 18 months with no extension periods and is estimated to commence 30th March 2026. Estimated contract spend is between £2,000,000 - £2,200,000 Ex Vat across the initial 18 month term. Full details relating to the services are provided in the tender documents. To participate, Suppliers will need to Register as a Supplier with ProContract, www.supplyingthesouthwest.org.uk, then Register an Interest before obtaining access to the tender documents. In the event of difficulties registering as a supplier, please refer to the System Administrator Proactis support team [email protected] Tender clarifications to be submitted in writing via Messaging in ProContract tender portal by 12th November 2025 15:00 hrs UK Local time. The Council’s responses to these clarification questions will be issued periodically on the ProContract tender portal. Tender Responses are required to be submitted no later than 19th November 2025, 15:00 hrs UK Local time via ProContract tender portal - https://www.supplyingthesouthwest.org.uk/ Supplying the South West Portal, https://www.supplyingthesouthwest.org.uk/ is the only portal that includes all the relevant documents required to respond to this opportunity, bearing Project Id: DN792814 No Tender submissions will be considered without completing the tender documents in full including attachments and returning them in alignment with the instructions within the tender documents.

Katy Reed

Published 2 days ago

AI Bid Assistant

Our AI-powered tool to help you create winning bids is coming soon!

View Contract Source Save Contract

Timeline active

Publish
Bid
Evaluate
Award
Complete